OPERATION |
20. CIRCUIT BREAKERS
These circuit breakers provide separate overload current protection for each 120V circuit at the 240V receptacle, each 120V receptacle, the 120VAC in the
21. 120VAC RECEPTACLES
These two 120VAC
22. GROUND STUD
Provides a connection point for connecting the machine case to earth ground. Refer to “MACHINE GROUNDING” in the Installation chapter for proper machine grounding information.
ENGINE OPERATION
STARTING THE ENGINE
1.Open the engine compartment door and check that the fuel shutoff valve located to the left of the fuel filter housing is in the open position (lever to be in line with the hose).
2.Check for proper oil level and coolant level. Close engine compartment door.
3.Remove all plugs connected to the AC power receptacles.
4.Set IDLER switch to “AUTO”.
5.Set the RUN/STOP switch to “RUN”. Observe that the engine protection and battery charging lights are on. After 10 seconds, the engine protection light will turn off.
6.Within 30 seconds, press and hold the engine START button until the engine starts.
7.Release the engine START button when the engine starts.
8.Check that the engine protection and battery charging lights are off. The engine protection light is on after starting, the engine will shutdown in a few seconds. Investigate any indicated problem.
9.Allow the engine to warm up at low idle speed for several minutes before applying a load and/or switching to high idle. Allow a longer warm up time in cold weather.
COLD WEATHER STARTING
With a fully charged battery and the proper weight oil, the engine should start satisfactorily even down to about
STOPPING THE ENGINE
1.Switch the RUN/STOP switch to “STOP”. This turns off the voltage supplied to the shutdown solenoid. A backup shutdown can be accomplished by shutting off the fuel valve located on the fuel line.
Vantage 500 CUMMINS