Wagner SprayTech GM 2000 EACF Starting WORK, and Handling, Preparation, Adjusting round jet fan

Page 17

GM 2000 EAC - EN

4.STARTING WORK, AND HANDLING

Caution

See SAFETY REGULATIONS in chapter 1.

4.1Preparation

Locking of spray gun! Turn locking nut clockwise until stop (viewed from back of gun)

Check that spraying pressures are suitable.

Check that all connections are tight and do not leak.

4.2General rules for handling the spray gun

The following rules must be observed before any work is carried out on the equipment or during breaks in work:

Switch off control unit.

Relieve spray gun and system pressure.

Lock the spray gun with the locking nut.

4.3Start-up for AirCoat spraying

1.Connect earth cable to the earth terminal of the control unit. Fix the other end using the clamp to the nearest earthed piece of the equipment (cabin, transport device, or similar). Make sure that all other conductive parts within the work area are earthed.

2.Connect material hose to spray gun and to pump.

3.Connect air hose to spray gun and to oil-free, dry air supply with regulator.

4.Connect cable to control unit VM 200 EN or EPP 200 EN.

5.Set material pressure (approx. 80 bar) at material pump and switch on control unit.

6.Spray (actuate trigger).

7.Adjust spraying pressure at the paint pump regulator, according to jet and object.

8.Now open AirCoat air (approx. 1 to 2.5 bar) and adjust for the optimum atomiza- tion.

Adjusting round jet fan:

9.By turning the tip nut , the atomizing air jet can additionally be adjusted. By exchanging tips, various paint outputs can be achieved.

Note

Do not close the gap for atomizing air between tip nut and body.

for flat jet process :

9.To change the jet width; fit another AirCoat flat jet nozzle, with the required fan an- gle.

By exchanging tips, various paint outputs can be achieved.

4.1

Image 17
Contents Operating Manual Page GM 2000 EAC EN ContentsSpare Parts Catalogue Introduction Using the manualSafety Safety RegulationsSafety information on harmless electrostatic discharges Accessories and spare partsProtective breathing masks EarthingPTB Conformity certification Months / 6 months for multi-shift operation Important notes on product liability0179 CE ConformityShort explanation CE = Communauté Européenne EMC testFunctional description Technical dataDescription Activated and material valve open AirCoat round jet process Electrostatic effect What kind of spraying material can be applied?Preparation of paint Preparation Before Starting WorkEarthing Imperfect earthing of a workpiece will resultEmpty Starting WORK, and Handling Adjusting round jet fanPreparation For flat jet processChanging from AirCoat round jet to AirCoat flat jet Cleaning of clogged round jet tipsExchange of Aircoat round jet tip insert EAC round Clogging of AirCoat flat jet tips Cleaning of AirCoat flat jet tipsReplacing AirCoat flat jet tips Empty Decommissioning and cleaning MaintenanceIf the round jet nozzle is fitted If the flat jet nozzle is fittedExchange or cleaning of filters Dissassembly of AirCoat nozzle body round jetExchange of complete valve rod, or of valve rod seals Adjustment of the valve rod sealExchange of paint channel Problem Cause Solution Trouble Shooting and SolutionsEmpty Round jet tip inserts AccessoriesPart-No Marking Volume flow Jet width Recommended filter AirCoat flat tips Hoses and fittings Long filter housing and and filtersSpecial tools DescriptionEmpty Special marks in spare parts lists How to order spare parts?Spare Parts Catalogue Part No., description and quantityQuantity Description Spare parts listGM 2000 EAC EN Empty Page Deutschland / Germany England / United KingdomSchweiz / Switzerland CH- 9450 Altstätten