TOP VIEW
FRONT VIEW
Ground Wire
Ground Stud
Bracket from kit Bracket from kit
Nut from kit
Screw from kit
Nut from kit
Front of 685
Front of UPS
Battery Cabinet
Figure 9. Attaching UPS Base to Series 685 Base
17.Locate the ground wire from the field kit. Route the ground wire from the customer ground stud in the battery cabinet, under the lower
18.Repeat Steps 2 through 17 to attach additional Series 685 Battery Cabinets to the other side of the first battery cabinet. Level the cabinets with the leveling screws.
|
|
|
Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets | 15 | |
Installation Manual 164201408 Rev. P00 053002 |
|
|