N(/(*(/Fg\e<e[N`[\9\ckJXe[\i
NOTICE
8]k\i cffj\e`e^ k_\ c\]k Zfem\pfi ifcc\i YiXZb\k# k_\ i\Xi Zfem\pfi ifcc\i Xjj\dYcp `j jlggfik\[ Yp `kj XkkXZ_d\ek kf k_\ Zfem\pfi dfkfi Xjj\dYcp% ?fn\m\i#kfXmf`[[XdX^`e^k_\ifcc\iXjj\dYcp#;F EFKglklee\Z\jjXipjkiX`efek_`jXjj\dYcp%
Rear Conveyor
Roller Bracket
Hex Bolt
(1 of 2)
.% Loosen, but do not remove, the upper cap screws on the left side of the conveyor assembly that secure the sander assembly to the mounting brackets (see =`^li\*- on GX^\*.).
Efk\1Cffj\e`e^k_\j\ZXgjZi\njn`cci\c`\m\k_\ jkiX`efek_\YiXZb\kj]fik_\e\okjk\g%
/% Remove the two hex bolts and flat washers on the left side of the conveyor that secure the sander assembly mounting brackets to the cabinet stand (see =`^li\*/).
0% With assistance, lift the left side of the conveyor assembly up approximately 1", then remove the con- veyor belt, as shown in =`^li\*0.
('% Slide the new conveyor belt onto the conveyor assembly, then
((%
()%
=`^li\*/% Rear conveyor roller bracket unattached from the conveyor support.
=`^li\*0% Removing the conveyor belt
from the machine.