Hansol Multitech Uromat 3000 installation instructions Installing the Cover Panels

Page 47

2. 18 Installing the Cover Panels

Caution: Before the cover panels are installed, it is best to carry out the adjustment as described in Section 3.

Tube unit support arm:

Place the two halves of the cover panel (Fig. 30/Pos. 1) over the support arm (Pos. 2) while paying attention to the two safety switches (Fig. 21/Pos. 1+2) and secure them in place with

the roll pins (Pos. 4). Place the two head cover panels (Pos. 5) over the support arm and secure them in place with the paneling screws (Pos. 6).

Unit base:

Reinstall the narrow left (Fig. 31/Pos. 4) and the narrow right cover panel (Pos. 5). Reinstall the unit base cover panel (Fig. 29/Pos.1), the left (Pos. 2) and right cover panels (Pos. 3).

Reinstall the cover panel bracket for the floor panel (Pos. 6) and the back wall (Pos. 7).

Monitor support arm

Fig. 31

Fig. 32

2.19 Installing the Monitor Support Arm (Option)

Insert the monitor support arm (Fig. 32/Pos. 1) into the tube (Pos. 3).

06/00

- 47 of 90 -

0116 7201

Rev. 00 © 2000 Hans Pausch Röntgengerätebau Graf -Zeppelin-Str. 1 D-91056 Erlangen ALL RIGHTS RESERVED Ru

Image 47
Contents Installation Instructions Uromat Contents Not configured AdjustmentsTechnical Maintenance Packaging Dimensions and Weights General Safety InformationComponent Weights Component DimensionsComponent Designations FFA Dimensional Drawing, Right-handed VersionFFA Dimensional Drawing, Left-handed Version345 Drehachse Dimensional Drawing for Floor Mounting, Left-handed Version 0116 06/00 Conditions for Transport and Storage Power Line Connection DataRequired Special Tools Required Test EquipmentContents of Circuit Diagram Circuit Diagram,06/00 0116 Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Circuit Diagram, Collimator connection Uromat Component Designations for the Circuit DiagramSystem Location Component Function LED1 +A6 Terminal strip for Bucky Cassette box motor potentiometer Function Description of the Controller CPU Board BoardsBreaker Board Display Board Footswitch Board Control UnitUnpacking the Unit Preparations for MountingRemoving the Unit from the Pallet Installing the Unit Column Aligning the Unit Column Installing the Tube Unit Support Arm Temporarily Connecting Line PowerPreinstalling the Tube Unit Collimator Combination Laying the Collimator Cables Installing the Image IntensifierTo lay cables in the unit, 7 meters are required Laying the High Voltage CablesPage Laying the I.I. Cable Making the Power Connection through the GeneratorInstalling the Measuring Chamber Installing the Tilt Angle Display- Error Display Installing the Grid Replacing the GridInstalling the Monitor Support Arm Option Installing the Cover PanelsSealing the Table Frame Cover Panel Installing the Mount for the Flush BowlTube Unit Support Arm AdjustmentLengthwise to the tabletop, for this Central Beam Center of BuckyCentral Beam Center Movement Path Potentiometer, Tabletop longitudinal I.I. Carriage System Potentiometer Movement Path Potentiometer, Tabletop transverseBucky Cassette Tray Movement Path Potentiometer Potentiometer 2 Table Tilt Movement Path Potentiometer 1 Table Tilt Movement PathTabletop Transverse Safety Switch Not configured Tabletop Longitudinal Safety SwitchTable Down Movement Path Switch Strike Plate Bucky Movement Path Safety Switch13 I.I. Carriage Movement Path Safety Switch Table Up Movement Path Switch Strike PlateSpindle Nut Safety Limit Switch 16 -20 Tilt Movement Safety Switch17 +88 Tilt Movement Safety Switch Raise-Lower Tabletop Belt Tension Accessory Sensor SwitchesTabletop longitudinal Belt Tension Cassette Carriage Drive Belt Tension Equipment Operation in the Service ModeProcedure Setting ParametersStartup Adjusting the AxesCollimator Basic Setting Format Setting the Collimator to the Cassette and I.I. FormatCassette Format Saving the Parameters in the PC Setup Parameters Electronic Adjustment ParametersTabletop long. Store yes/no 1/0 Mechanical and Electrical Checks Technical MaintenancePreparations Page Function Check Page Spare Parts, Overview 176Spare Parts, Unit Column Right-handed, Left-handed Versions 41/43 40/41 /10Spare Parts, Table Frame Tabletop, Right-handed Version 122 125 11 119 120 121 151Spare Parts, Table Frame Tabletop, Left-handed Version 128 135 185 136213 209 202 203 191 192 197 194 193 198 201 207 / 210 Spare Parts, Tube Unit Support Right-handed Version 193 191Spare Parts, Tube Unit Support Left-handed Version 209 207 / 210249 155 156 Spare Parts, AccessoriesPos Designation Spare Parts ListPos Designation Pos Designation Pos Designation Pos Designation Error Cause Corrective Measure Number TroubleshootingPage Version Update Board ReplacementMaintenance Verification Location of Identification Labels Labeling Overview of Labels Max kg/ 66 lb