4. Technical Maintenance
NOTE:
The maintenance described below must be performed every12 months.
If unit components need to be moved using the motor during maintenance, or if functions need to be checked while the unit is under power, the unit must be switched off immediately after reaching the new position or after completing the particular work step and the immediately disconnected from power again.
Components that are removed may only be replaced with original parts that are listed in the attached spare parts list. For maintenance, only
4.1 Mechanical and Electrical Checks
Preparations:
-Move table to the max. up position.
-Switch power off to the system (line power)
-Remove the unit base cover cap
-Remove the unit base cover panels
-Remove the system carriage cover panels
Floor mounting:
-Check the unit column in both directions with the spirit level. Compensate any differences by using shims and retighten the mounting screws.
-Check the mounting screws for secure tightness. If needed, retighten. Torque 25 Nm (2.5 kpm)
Manual control unit:
-Check cable
-Check the function of all buttons
-Check the function of all LED’s.
-Check the cables for good condition and for secure connection. If necessary, replace damaged cables.
-Clean the spaces between the individual footswitches.
-Check all switch functions.
Fluoroscopy and exposure footswitch:
-Check the cables for good condition and for secure connection. If necessary, replace damaged cables.
-Clean the spaces between the individual footswitches.
-Check the switch functions.
06/00 | - 67 of 90 - | 0116 7201 |
Rev. 00 © 2000 Hans Pausch Röntgengerätebau Graf