SECTION 4 – INSTALLATION
4-1. Installing Welding Generator
Movement | Airflow Clearance |
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
YAlways securely fasten welding generator onto transport vehicle or trailer and comply with all DOT and other applicable codes.
18in
(460 mm)
18in
(460 mm)
Location
OR
install1 10/00*– 802
4-2. Grounding Generator To Truck Or Trailer Frame
| Y Always ground | generator | ||
|
| frame to vehicle frame to pre- | ||
|
| vent electric shock and static | ||
|
| electricity hazards. | ||
| 1 | Generator Base |
| |
| 2 | Metal Vehicle Frame | ||
| 3 | Equipment Grounding | ||
1 | 3 | Terminal |
|
|
|
|
| ||
4 | Grounding Cable |
| ||
|
| |||
GND/PE | 4 |
|
|
|
Use #10 AWG or larger insulated | ||||
| copper wire. |
|
| |
OR | Y If unit does not have GFCI re- | |||
|
| ceptacles, | use | GFCI- |
|
| protected extension cord. |
Electrically bond generator frame to vehicle frame by
2 | 2 |
install1 10/00* – Ref. 151 556 /