Southbend SB1029 owner manual Preparation Overview, Things Youll Need

Page 11

For Machines Mfg. Since 8/09

P R E P A R A T I O N

Model SB1029

Preparation Overview

The list below outlines the basic process to follow to prepare your machine for operation. Specific steps for each of these points will be covered in detail later in this section.

The typical preparation process is as follows:

1.Unpack the machine and inventory the contents of the box/crate.

2.Clean the machine and its components.

3.Identify an acceptable location for the machine and move it to that location.

4.Level the machine and either bolt it to the floor or place it on mounts.

5.Finish assembling the machine by installing the necessary components from the inventory, and make any necessary adjustments or inspections to ensure the machine is ready for operation.

6.Connect the machine to the power source.

7.Test run the machine to make sure it functions properly and is ready for operation.

Things You'll Need

During the setup process, operation, and maintenance of your machine, you'll need the following items:

For Lifting

ssA forklift or other power lifting device rated for the weight of the machine.

ss,IFTINGT3TRAP or Chain (rated for at least 2500 lbs.)

For Power Connection

ss!!POWEROSOURCE THATOMEETSCTHE MINIMUMT circuit requirements for this machine. (Refer to the Power Supply Requirements

section for details.)

ss!!QUALIFIEDLELECTRICIAN TO ENSURETARSAFE AND code-compliant connection to the power source.

For Assembly

ssAnother Person ss Cotton Rags ss Mineral Spirits ss 3AFETY 'LASSES ss Wrench 19mm

ss Oil Can Filled with Oil Listed in Maintenance

-9-

Image 11
Contents Model SB1029 18 Surface GrinderManual Feedback UpdatesCustomer Service Scope of ManualTable of Contents Capabilities FeaturesAbout This Machine Identification IdentificationMachine Specifications Machine SpecificationsT R O D U C T I O N Understanding Risks of Machinery Basic Machine SafetyF E T Y Additional Surface Grinder Safety Things Youll Need Preparation OverviewCircuit Information Power Supply RequirementsAvailability Full-Load Current RatingFor 440V Connection For 220V Connection PrewiredGrounding Requirements Extension CordsInventory UnpackingBasic steps for removing rust preventative Cleaning & ProtectingBefore cleaning, gather the following Location Leveling Lifting & MovingLeveling & Mounting To assemble the machine AssemblyBolting to Concrete Floors Headstock elevation handwheel Initial Lubrication Power ConnectionInspections & Adjustments To test run your machine Test RunOperation Overview Control panel ControlsGrade Wheel SelectionAbrasive Type Grit SizeTo perform a ring test Wheel InspectionRing Test To inspect a wheel for damageTo remove and install a grinding wheel Removing & Installing Grinding WheelsWheel mounting hub To remove and reinstall the wheel and hub Removing & Installing Wheel & HubPulling wheel hub To dress the grinding wheel Wheel DressingTo balance the grinding wheel Wheel BalancingE R a T I O N Grinder Operation To adjust the dust port positionMagnetic Chuck Dust Port PositioningGrinding Tips Using the Surface GrinderBasic Lubrication Maintenance ScheduleRecommended Oils To change the oil and adjust the flow rateTo remove table backlash Removing Table BacklashTR O U B L E S H O OTI N G TR O U B L E S H O OTI N G To prepare your machine for storage Machine StorageWiring Diagram Color KEY Electrical Safety Instructions440V Rewiring forHardwiring to Power Source To convert the Model SB1029 to operate onMotor 220 VAC L15-15 Plug 220V Electrical Components220V Electrical Box Electrical Box ContentsOil Pump Motor Spindle 440V Electrical ComponentsElectrical Box Electrical Box ContentsDescription ColumnElevation Control 125 109 108 110 111 123 121 113 101 112 107 106 124 126 146 BaseSaddle Main Assembly List Tools Electrical 301 Machine LabelsRotation Label Machine Labels ListT E S R R a N T Y Southbendlathe.com