Southbend SB1029 owner manual Rewiring for, Hardwiring to Power Source, 440V

Page 42

Model SB1029

E L E C T R I C A L

For Machines Mfg. Since 8/09

Rewiring for 440V

6

7

0

U

V

W

U1

V1

W1

R

S

T

Wiring diagrams are provided in this section

6

7

0

U

V

W

U1

V1

W1

R

S

T

showing the Model SB1029 wired for both 220V

 

 

 

 

 

 

 

 

 

 

 

GND

and 440V. Refer to these diagrams if needed

 

 

 

 

 

 

 

 

 

 

 

when following this procedure. Additionally,

 

 

0

U

V

W

 

 

 

R

S

T

 

 

 

 

 

 

 

 

 

 

 

 

you must purchase 440V Conversion Kit (Part

 

 

 

 

 

 

 

 

 

 

 

 

No. PSB1029510) in order to complete the

 

 

 

 

 

 

 

 

 

 

 

 

conversion.

 

 

 

 

 

 

 

 

 

 

 

 

Hardwiring to Power Source

Incoming

Power Cord

Hardwire setups require power supply lines to

 

 

 

 

 

be enclosed inside of conduit that is securely

 

Figure 52. Power connection wiring.

mounted and constructed in adherence to

 

applicable electrical codes.

 

 

Items Needed

 

 

Qty.

 

 

 

 

 

 

A hardwire setup for this machine must be

440V Conversion Kit (Part No. PSB1029510) ..... 1

equipped with a locking disconnect switch

Phillips Screwdriver #2 ........................................ 1

as a means to disconnect the power during

To convert the Model SB1029 to operate on

adjustments or maintenance, which is a typical

requirement for lock-out/tag-out safety programs

440V:

 

 

 

(commonly required by OSHA). Figure 13 shows

1. DISCONNECT MACHINE FROM POWER!

a simple diagram of a hardwire setup with a

 

 

 

 

 

locking disconnect switch between the power

2.

Open the motor junction box, then loosen

source and the machine.

 

 

 

 

 

the nine screws that secure the wires and

 

 

 

 

 

 

 

 

 

 

jumpers to the motor junction block shown in

 

Locking

 

 

 

Figure 53.

 

 

 

Power Source

Disconnect Switch

Machine

 

oto

 

 

 

 

 

 

 

 

4

5

6

 

 

 

 

 

 

Jumpers

7

8

9

 

 

 

 

 

GND

 

 

 

 

 

 

 

 

 

Conduit

Conduit

 

 

 

1

2

 

 

 

 

 

3

 

 

 

 

 

 

 

 

Figure 13. Typical hardwire setup with a locking

 

U

V

W

 

 

 

 

 

 

 

disconnect switch.

 

 

 

 

 

 

Due to the complexity required for planning,

 

bending, and installing the conduit necessary for

 

a hardwire setup, this type of setup can only be

Figure 53. 220V Jumper locations.

performed by an experienced electrician.

For Electrician: Connect the incoming power wires as shown in Figure 13.

-40-

READ ELECTRICAL SAFETY

 

ON PAGE 39 FIRST!

Image 42
Contents 18 Surface Grinder Model SB1029Scope of Manual UpdatesCustomer Service Manual FeedbackTable of Contents Features About This MachineCapabilities Identification IdentificationMachine Specifications Machine SpecificationsT R O D U C T I O N Basic Machine Safety Understanding Risks of MachineryF E T Y Additional Surface Grinder Safety Preparation Overview Things Youll NeedFull-Load Current Rating Power Supply RequirementsAvailability Circuit InformationExtension Cords For 220V Connection PrewiredGrounding Requirements For 440V ConnectionUnpacking InventoryCleaning & Protecting Before cleaning, gather the followingBasic steps for removing rust preventative Location Lifting & Moving Leveling & MountingLeveling Assembly Bolting to Concrete FloorsTo assemble the machine Headstock elevation handwheel Power Connection Inspections & AdjustmentsInitial Lubrication Test Run To test run your machineOperation Overview Controls Control panelGrit Size Wheel SelectionAbrasive Type GradeTo inspect a wheel for damage Wheel InspectionRing Test To perform a ring testRemoving & Installing Grinding Wheels To remove and install a grinding wheelWheel mounting hub Removing & Installing Wheel & Hub To remove and reinstall the wheel and hubPulling wheel hub Wheel Dressing To dress the grinding wheelWheel Balancing To balance the grinding wheelE R a T I O N Dust Port Positioning To adjust the dust port positionMagnetic Chuck Grinder OperationUsing the Surface Grinder Grinding TipsMaintenance Schedule Basic LubricationTo change the oil and adjust the flow rate Recommended OilsRemoving Table Backlash To remove table backlashTR O U B L E S H O OTI N G TR O U B L E S H O OTI N G Machine Storage To prepare your machine for storageElectrical Safety Instructions Wiring Diagram Color KEYTo convert the Model SB1029 to operate on Rewiring forHardwiring to Power Source 440VMotor 220V Electrical Components 220 VAC L15-15 PlugElectrical Box Contents 220V Electrical Box440V Electrical Components Oil Pump Motor SpindleElectrical Box Contents Electrical BoxColumn DescriptionElevation Control 125 109 108 110 111 123 121 113 101 112 107 106 124 126 Base 146Saddle Main Assembly List Tools Electrical Machine Labels 301Machine Labels List Rotation LabelT E S R R a N T Y Southbendlathe.com