Carrier 40RMS, 40RMQ installation instructions Installation, Start-Up Service Instructions

Page 1

40RM

40RMQ

40RMS Packaged Air-Handling Units 50/60 Hz

Installation, Start-Up and

Service Instructions

CONTENTS

Page

SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . 1

PRE-INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . 1

Moving and Storage . . . . . . . . . . . . . . . . . . . . . . . . 1

Rigging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-23

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Uncrating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Unit Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Unit Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Refrigerant and Chilled Water

Piping Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Refrigerant Piping . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Chilled Water Piping . . . . . . . . . . . . . . . . . . . . . . . 17

Condensate Drain . . . . . . . . . . . . . . . . . . . . . . . . . . 18

Fan Motors and Drives . . . . . . . . . . . . . . . . . . . . . 18

Power Supply and Wiring . . . . . . . . . . . . . . . . . . . 19

Connecting Ductwork . . . . . . . . . . . . . . . . . . . . . . 22

Return-Air Filters . . . . . . . . . . . . . . . . . . . . . . . . . . 22

START-UP

23

SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23-39

Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Fan Motor Lubrication . . . . . . . . . . . . . . . . . . . . . . 23

Fan Shaft Bearings . . . . . . . . . . . . . . . . . . . . . . . . . 23

Centering Fan Wheel . . . . . . . . . . . . . . . . . . . . . . . 24

Fan Shaft Position Adjustment . . . . . . . . . . . . . . 24

Individual Fan Wheel Adjustment . . . . . . . . . . . 24

Fan Belts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Fan Rotation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Fan Pulley Alignment . . . . . . . . . . . . . . . . . . . . . . . 25

Pulley and Drive Adjustment . . . . . . . . . . . . . . . . 25

Condensate Drains . . . . . . . . . . . . . . . . . . . . . . . . . 25

Return-Air Filters . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Chilled Water Coil Freeze Protection . . . . . . . . 25

Coil Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Cleaning Cooling Coil . . . . . . . . . . . . . . . . . . . . . . 25

Cleaning Insulation . . . . . . . . . . . . . . . . . . . . . . . . 25

Replacing Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

START-UP CHECKLIST . . . . . . . . . . . . . . . . CL-1,CL-2

SAFETY CONSIDERATIONS

Installing, starting up, and servicing this equipment can be hazardous due to system pressures, electrical components and equipment location (elevated structures, etc.).

Only trained, quali®ed installers and service mechanics should install, start up, and service this equipment.

Untrained personnel can perform basic maintenance func- tions such as cleaning coils, and cleaning and replacing

®lters. All other operations should be performed by trained service personnel.

When working on the equipment, observe precautions in the literature and on tags, stickers, and labels attached to the equipment.

·Follow all safety codes.

·Wear safety glasses and work gloves.

·Use care in handling, rigging, and setting bulky equipment.

Be sure all power to equipment is shut off before per- forming maintenance or service. More than one discon- nect may be present.

PRE-INSTALLATION

Moving and Storage Ð To transfer unit from truck to storage site, use a fork truck. Do not stack units more than 2 high during storage. If unit is to be stored for more than 2 weeks before installation, choose a level, dry storage site free from vibration. Do not remove plastic wrap or skid from unit until ®nal installation.

Rigging Ð All 40RM Series units can be rigged by us- ing the shipping skid. Units are shipped fully assembled. Do not remove shipping skids or protective covering until unit is ready for ®nal placement; damage to bottom panels can result. Use slings and spreader bars as applicable to lift unit.

INSTALLATION

General Ð Allow 21¤2 ft at front and side of unit for service clearance and air¯ow. For units equipped with an econo- mizer, refer to the accessory installation instructions for ad- ditional clearance requirements. Be sure ¯oor, wall, or ceil- ing can support unit weight (Tables 1A-1F). See Fig. 1A-1C for dimensions.

Uncrating Ð Move unit as near as possible to ®nal lo- cation before removing shipping skid.

Remove metal banding, top skid, and plastic wrap. Ex- amine unit for shipping damage. If shipping damage is evident, ®le claim with transportation agency. Remove base skid just prior to actual installation.

Check nameplate information against available power supply and model number description in Fig. 2.

Accessories Ð Refer to instructions shipped with each accessory for speci®c information.

Manufacturer reserves the right to discontinue, or change at any time, speci®cations or designs without notice and without incurring obligations.

Book

1

4

 

PC 111

Catalog No. 534-053

Printed in U.S.A.

Form 40RM-9SI

Pg 1

11-95

Replaces: 40RM-1SI

Tab

3c

2e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 1
Contents Installation, Start-Up Service Instructions Ð 40RM Physical Data, English Unit 40RMQ Ð 40RMQ Physical Data, EnglishUnit 40RMS Ð 40RMS Physical Data, EnglishChilled Water Coil Ð 40RM Physical Data, SI Ð 40RMQ Physical Data, SI Ð 40RMS Physical Data, SI Unit Unit Weight Ð Dimensions Ð Sizes40RM014 Ð Dimensions Ð Sizes 028,034 40RMQ 40RMS UnitNumbers Refrigerant and Chilled Water Piping Access HolesFace-Split Coil Suction Liquid Line Piping Typical TXV Distributor Feeder Tubes Nozzle Unit PER Distributor Factory-Installed Nozzle and Distributor DataLiquid Unit Line Quantity 38AQS Size Required Reference 40RMQ Fitting Requirements11¤8 Street Elbow Nipple, 23¤4 L Long Radius Elbow Liquid Typical 40RMS Chilled Water Piping Condensate Drains Wiring and Service Access Side Panel Removed Electrical Data, Standard Motors Voltage FAN Motor Power Supply Unit PH-HZFLA MocpFLA Ð Electrical Data, Alternate MotorsMocp Ð Fan Contactor Coil Data Manufacturer Lubricant Lubricant DataFan Shaft Bearing Fan Pulley Alignment Ð Align as follows Ð Fan Motor Data, Alternate Motor Ð English Ð Fan Motor Data, Standard Motor Ð English40RMQ 40RMS Unit 40RMS 40RMQ UnitÐ Fan Motor Data, Alternate Motor Ð SI Ð Fan Motor Data, Standard Motor Ð SIÐ Medium-Static Drive Data, 60 Hz Ð English Ð Standard Drive Data, 60 Hz Ð EnglishMotor Drive FAN DriveÐ Standard Drive Data, 50 Hz Ð English Ð High-Static Drive Data, 60 Hz Ð EnglishÐ High-Static Drive Data, 50 Hz Ð English Ð Medium-Static Drive Data, 50 Hz Ð EnglishÐ Medium-Static Drive Data, 60 Hz Ð SI Ð Standard Drive Data, 60 Hz Ð SI40RMQ Unit Ð Standard Drive Data, 50 Hz Ð SI Ð High-Static Drive Data, 60 Hz Ð SIÐ High-Static Drive Data, 50 Hz Ð SI Ð Medium-Static Drive Data, 50 Hz Ð SIAirflow Ð Fan Performance Data Ð 0.0-1.2 in. wg ESP Ð EnglishÐ Fan Performance Data Ð 1.4-2.4 in. wg ESP Ð English Unit Airflow Pressure Drop Ð Fan Performance Data Ð 0-300 Pa ESP Ð SI Ð Fan Performance Data Ð 350-600 Pa ESP Ð SI Filter Removal/Replacement Page Page Copyright 1995 Carrier Corporation START-UP Checklist Comp A1 Comp B1 Check Voltage Imbalance