Carrier 40RMS, 40RMQ installation instructions START-UP Checklist

Page 43

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

LINE

- -

DOTTED

- - - -

ALONG

- - -

CUT

- -

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

LINE

- -

DOTTED

- - - -

CUT ALONG

- - - -

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

START-UP CHECKLIST

(SPLIT SYSTEMS WITH 40RM/RMQ/RMS UNITS)

A. Preliminary Information

OUTDOOR: MODEL NO.

 

 

 

SERIAL NO.

 

 

INDOOR: MODEL NO.

 

 

 

SERIAL NO.

 

ADDITIONAL ACCESSORIES

 

 

 

 

B. Pre-Start-Up

OUTDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS THERE ANY SHIPPING DAMAGE?

 

 

 

 

 

 

 

 

 

 

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IF SO, WHERE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WILL THIS DAMAGE PREVENT UNIT START-UP?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE GROUND WIRE BEEN CONNECTED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THERMOSTAT(S) AND INDOOR FAN CONTROL WIRING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTIONS MADE AND CHECKED?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE ALL WIRING TERMINALS (including main power supply) TIGHT?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE OUTDOOR UNIT CRANKCASE HEATERS BEEN ENERGIZED FOR 24 HOURS?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

INDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

ARE PROPER AIR FILTERS IN PLACE?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

DO THE FAN BELTS HAVE PROPER TENSION?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIPING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40RM,RMQ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR UNIT COILS AS REQUIRED?

(Y/N)

 

 

 

 

HAVE LEAK CHECKS BEEN MADE AT COMPRESSORS, CONDENSERS, INDOOR COILS,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TXVs (Thermostatic Expansion Valves) SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS

 

 

 

 

 

 

 

WITH A LEAK DETECTOR?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCATE, REPAIR, AND REPORT ANY LEAKS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (BACKSEATED)?

(Y/N)

 

 

 

 

 

 

 

 

ARE THE COMPRESSOR OIL SIGHT GLASSES SHOWING CORRECT LEVELS?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS AIR BEEN BLED FROM SYSTEM?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE LEAK CHECKS BEEN MADE AT COMPRESSORS, CHILLERS, VALVES, AND INDOOR COILS?

 

 

(Y/N)

LOCATE, REPAIR, AND REPORT ANY LEAKS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer reserves the right to discontinue, or change at any time, speci®cations or designs without notice and without incurring obligations.

Book

1

4

 

PC 111

Catalog No. 534-053

Printed in U.S.A.

Form 40RM-9SI

CL-1

11-95

Replaces: 40RM-1SI

Tab

3c

2e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 43
Contents Installation, Start-Up Service Instructions Ð 40RM Physical Data, English Unit 40RMQ Ð 40RMQ Physical Data, EnglishUnit 40RMS Ð 40RMS Physical Data, EnglishChilled Water Coil Ð 40RM Physical Data, SI Ð 40RMQ Physical Data, SI Ð 40RMS Physical Data, SI Unit Unit Weight Ð Dimensions Ð Sizes40RM014 Ð Dimensions Ð Sizes 028,034 40RMQ 40RMS UnitNumbers Refrigerant and Chilled Water Piping Access HolesFace-Split Coil Suction Liquid Line Piping Typical TXV Distributor Feeder Tubes Nozzle Unit PER Distributor Factory-Installed Nozzle and Distributor DataLiquid Unit Line Quantity 38AQS Size Required Reference 40RMQ Fitting Requirements11¤8 Street Elbow Nipple, 23¤4 L Long Radius Elbow Liquid Typical 40RMS Chilled Water Piping Condensate Drains Wiring and Service Access Side Panel Removed Mocp Voltage FAN Motor Power Supply Unit PH-HZElectrical Data, Standard Motors FLAFLA Ð Electrical Data, Alternate MotorsMocp Ð Fan Contactor Coil Data Manufacturer Lubricant Lubricant DataFan Shaft Bearing Fan Pulley Alignment Ð Align as follows 40RMS 40RMQ Unit Ð Fan Motor Data, Standard Motor Ð EnglishÐ Fan Motor Data, Alternate Motor Ð English 40RMQ 40RMS UnitÐ Fan Motor Data, Alternate Motor Ð SI Ð Fan Motor Data, Standard Motor Ð SIFAN Drive Ð Standard Drive Data, 60 Hz Ð EnglishÐ Medium-Static Drive Data, 60 Hz Ð English Motor DriveÐ Standard Drive Data, 50 Hz Ð English Ð High-Static Drive Data, 60 Hz Ð EnglishÐ High-Static Drive Data, 50 Hz Ð English Ð Medium-Static Drive Data, 50 Hz Ð EnglishÐ Medium-Static Drive Data, 60 Hz Ð SI Ð Standard Drive Data, 60 Hz Ð SI40RMQ Unit Ð Standard Drive Data, 50 Hz Ð SI Ð High-Static Drive Data, 60 Hz Ð SIÐ High-Static Drive Data, 50 Hz Ð SI Ð Medium-Static Drive Data, 50 Hz Ð SIAirflow Ð Fan Performance Data Ð 0.0-1.2 in. wg ESP Ð EnglishÐ Fan Performance Data Ð 1.4-2.4 in. wg ESP Ð English Unit Airflow Pressure Drop Ð Fan Performance Data Ð 0-300 Pa ESP Ð SI Ð Fan Performance Data Ð 350-600 Pa ESP Ð SI Filter Removal/Replacement Page Page Copyright 1995 Carrier Corporation START-UP Checklist Comp A1 Comp B1 Check Voltage Imbalance