Honeywell WT6500 owner manual System Diagrams, Turbine Block Diagram

Page 15

SMARTBOX Installation

8

 

 

 

 

System Diagrams

TIP: The instructions in this section apply to a typical installation. Installation procedures may vary according to your specific application. For special applications, consult a qualified electrician or your WindTronics certified dealer.

PROFESSIONAL INSTALLATION: Installation must be compliant with all local electrical codes. Installation of this equipment should only be performed by a qualified electrician or by a Certified Renewable Energy System Installer.

Turbine Block Diagram

WIND

SPEED

WIND

DIRECTION

WIND

GENERATOR

DUMP LOAD

JUNCTION BOX

INTERFACE PCB

DIVERSION

LOAD

CONTROL

OVP

LOGIC

WIND

CONTROL

TURBINE

 

HV POWER

 

OUTPUT

TO SMARTBOX

Controller

Figure 2.1 Turbine Block Diagram

SMARTBOX™ Controller for HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev14

Image 15
Contents Smartbox Controller General Safety Instructions Safety InstructionsSafety Icons Important Safety InstructionsLimitations on USE Battery Safety InformationSafety Instructions Safety Instructions Table of Contents Commisioning For Information On See IntroductionSmartbox Controller Major System ComponentsParts Inspection Minimum to be used Battery OverviewBattery Types Not to be usedBattery Selection AC Load Detail and SelectionAmp-hour Ratings Not Recommended Recommended AppliancesIntroduction Smartbox Controller InstallationTurbine Block Diagram System DiagramsSmartbox Controller Diagram MountingRisk of Fire or Explosion Minimum Clearance for Proper Mounting Equipment DamageEXPLOSION/CORROSION Damage Shock Hazard and Fire Hazard WiringGrounding Shock HazardTurbine to Wiring DiagramTurbine Current Rating and Wiring Turbine Wiring and DistancesReverse Polarity Damage Turbine Over-current ProtectionBattery Connection Location Battery WiringShock or Fire Hazard Battery Over-current ProtectionAC Output Wiring AC Input WiringAC Output Over-current Protection Turbine Smartbox ControllerJunction BOX Control WiringBattery Setup Chart Battery SetupConnecting the Smartbox Controller Enclosure Internal WiringWarranty Void Warning To connect the Smartbox ControllerFire and Shock Hazard Smartbox Installation For Information on See Commissioning Process CommissioningDisplay Description Set the battery type FloodedCommissioning Process Check all connections for polarityPress Enter to start the turbine Shows if a turbine voltage was foundCommissioning Operation Viewing Operating Status IntroductionTurbine Operating States Starting/Stopping TurbineTurbine Operating States Controller Energy Consumption StatesOver Wind Speed System ProtectionTurbine User Stop State Cool DownSystem Faults Non Grid-Tie SmartBox Fault SpecificationsFault Description State Required for Fault Operations Menu Smartbox Controller Front PanelNavigation Buttons System Menu and NavigationTechnician Menu View Data Menu Battery Setup Menu Operation Specifications Environment Non Grid-Tie Smart Box Electrical SpecificationsInput ChargeWindTronics
Related manuals
Manual 46 pages 4.52 Kb