Honeywell WT6500 owner manual Technician Menu

Page 40

33

Operation

 

 

 

 

1.This is the home screen. The SMARTBOX™ Controller will scroll the listed information while in run mode and also the current firmware revision.

2.Turbine Fault Stop. Indicates if a fault has occurred.

3.This is the top menu level. From here you can go to the TECHNICIAN MENU or the START/STOP TURBINE MENU. Pressing enter to make a selection.

4.The Start/Stop Turbine Menu. Pressing UP will place the SMARTBOX™ Controller in user stop mode. In this mode the turbine will not spin and no A/C will be produced. Pressing DOWN will start the turbine. This will start a battery charge cycle.

Technician Menu

 

1

 

 

.TECHNICIAN

ENTER/BACK

 

..FORCE CHARGE ?

 

 

 

UP/DWN

 

 

2

 

 

.TECHNICIAN

ENTER/BACK

 

..FORCE AC ?

 

 

 

UP/DWN

 

 

3

 

UP/DWN

.TECHNICIAN

ENTER/BACK

..CLEAR PRODUCTION ?

 

 

 

UP/DWN

 

 

4

 

 

.TECHNICIAN

ENTER/BACK

 

..VIEW DATA ?

 

 

 

UP/DWN

 

 

5

 

 

.TECHNICIAN

ENTER/BACK

 

..BATTERY SETUP ?

 

 

Figure 4.6 Technician Menu

..FORCE CHARGE

UP=START

..START CHARGE

UP=START

..CLEAR PRODUCTION

UP/HOLD=CLEAR

VIEW DATA

MENU

BATTERY SETUP

MENU

1.Force Charge. This forces the turbine into the bulk charge state to begin charging the batteries.

2.Force AC. This turns on the inverter and switches the transfer switch to turbine AC. It also switches the turbine mode into float charge.

3.Clear production. This clears the Watt-Hour productions values in the turbine both turbine and AC productions values.

4.View Data. Selecting view data moves a menu level down to the view data menu.

5.Battery Setup. Selecting battery setup moves a menu level down to the battery setup menu.

SMARTBOX™ Controller for HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev14

Image 40
Contents Smartbox Controller Safety Instructions Safety IconsImportant Safety Instructions General Safety InstructionsBattery Safety Information Limitations on USESafety Instructions Safety Instructions Table of Contents Commisioning Introduction For Information On SeeMajor System Components Smartbox ControllerParts Inspection Battery Overview Battery TypesNot to be used Minimum to be usedAC Load Detail and Selection Battery SelectionAmp-hour Ratings Recommended Appliances Not RecommendedIntroduction Installation Smartbox ControllerSystem Diagrams Turbine Block DiagramMounting Smartbox Controller DiagramRisk of Fire or Explosion Equipment Damage Minimum Clearance for Proper MountingEXPLOSION/CORROSION Damage Wiring GroundingShock Hazard Shock Hazard and Fire HazardWiring Diagram Turbine toTurbine Wiring and Distances Turbine Current Rating and WiringTurbine Over-current Protection Reverse Polarity DamageBattery Wiring Battery Connection LocationBattery Over-current Protection Shock or Fire HazardAC Input Wiring AC Output WiringTurbine Smartbox Controller AC Output Over-current ProtectionControl Wiring Junction BOXBattery Setup Connecting the Smartbox ControllerEnclosure Internal Wiring Battery Setup ChartTo connect the Smartbox Controller Warranty Void WarningFire and Shock Hazard Smartbox Installation Commissioning For Information on See Commissioning ProcessSet the battery type Flooded Commissioning ProcessCheck all connections for polarity Display DescriptionShows if a turbine voltage was found Press Enter to start the turbineCommissioning Operation Introduction Turbine Operating StatesStarting/Stopping Turbine Viewing Operating StatusController Energy Consumption States Turbine Operating States System Protection Turbine User Stop State Cool Down Over Wind SpeedNon Grid-Tie SmartBox Fault Specifications System FaultsFault Description State Required for Fault Smartbox Controller Front Panel Navigation ButtonsSystem Menu and Navigation Operations MenuTechnician Menu View Data Menu Battery Setup Menu Operation Specifications Non Grid-Tie Smart Box Electrical Specifications InputCharge EnvironmentWindTronics
Related manuals
Manual 46 pages 4.52 Kb