Honeywell WT6500 owner manual Commisioning

Page 7

Table of Contents

VII

 

 

 

 

3. Commisioning

 

Commissioning Process

24

4. Operation

 

Introduction

28

Turbine Operating States

28

Starting/Stopping Turbine

28

Viewing Operating Status

28

Controller Energy Consumption States

29

Turbine Operating States

29

System Protection

30

System Faults

31

SMARTBOX™ Controller Front Panel

32

Navigation Buttons

32

System Menu and Navigation

32

Operations Menu

32

Technician Menu

33

View Data Menu

34

Battery Setup Menu

35

5. Specifications

 

Non Grid-tie SMARTBOX™ Electrical Specifications

38

SMARTBOX™ Controller for HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev14

Image 7
Contents Smartbox Controller General Safety Instructions Safety InstructionsSafety Icons Important Safety InstructionsLimitations on USE Battery Safety Information Safety Instructions Safety Instructions Table of Contents Commisioning For Information On See IntroductionMajor System Components Smartbox ControllerParts Inspection Minimum to be used Battery OverviewBattery Types Not to be usedAC Load Detail and Selection Battery SelectionAmp-hour Ratings Not Recommended Recommended AppliancesIntroduction Smartbox Controller InstallationTurbine Block Diagram System DiagramsMounting Smartbox Controller DiagramRisk of Fire or Explosion Equipment Damage Minimum Clearance for Proper MountingEXPLOSION/CORROSION Damage Shock Hazard and Fire Hazard WiringGrounding Shock HazardTurbine to Wiring DiagramTurbine Current Rating and Wiring Turbine Wiring and DistancesReverse Polarity Damage Turbine Over-current ProtectionBattery Connection Location Battery WiringShock or Fire Hazard Battery Over-current ProtectionAC Output Wiring AC Input WiringAC Output Over-current Protection Turbine Smartbox ControllerJunction BOX Control WiringBattery Setup Chart Battery SetupConnecting the Smartbox Controller Enclosure Internal WiringTo connect the Smartbox Controller Warranty Void WarningFire and Shock Hazard Smartbox Installation For Information on See Commissioning Process CommissioningDisplay Description Set the battery type FloodedCommissioning Process Check all connections for polarityPress Enter to start the turbine Shows if a turbine voltage was foundCommissioning Operation Viewing Operating Status IntroductionTurbine Operating States Starting/Stopping TurbineTurbine Operating States Controller Energy Consumption StatesOver Wind Speed System ProtectionTurbine User Stop State Cool DownNon Grid-Tie SmartBox Fault Specifications System FaultsFault Description State Required for Fault Operations Menu Smartbox Controller Front PanelNavigation Buttons System Menu and NavigationTechnician Menu View Data Menu Battery Setup Menu Operation Specifications Environment Non Grid-Tie Smart Box Electrical SpecificationsInput ChargeWindTronics
Related manuals
Manual 46 pages 4.52 Kb