These tests show that the hostname gets filtered out for account umeter. If any of the masquerading tests do not work, check the sendmail configuration file and ensure the email masquerading is implemented (through the DM macro):

IMPORTANT: The domainname must be resolvable in DNS for HP to accept email from the Utility Meter.

2.10 Configuring PPU Partitions and URS Devices

Depending on whether the Utility Meter will be metering Pay per use (PPU) server partitions or Utility Ready Storage (URS) devices (or both), see the following for configuration information:

For Pay per use (PPU) server partitions that need to be metered by the Utility Meter, configure the PPU partitions by adding them as a PPU WBEM Partition/Server. PPU server partitions can also be configured using the appropriate PPU Agent software command on each PPU partition, but configuring server partitions by adding them as a PPU WBEM Partition/Server is the preferred method. For more information about configuration via PPU Agent software, see the specific PPU User's Guide, which can be located in Related Documentation.

For URS devices that need to be metered by the Utility Meter, configure the devices in the Utility Meter GUI. For more information about this type of configuration, see Utility Meter Devices Tasks

2.11Verifying the Utility Meter Operation

You must verify the operation of the Utility Meter for any of the following changes:

The HP-UX system parameters were modified

The Utility Meter software was installed or reinstalled

The Utility Meter parameters were modified

For details of verifying the operation of the Utility meter, see Chapter 4: “Verifying Utility Meter Operation”.

IMPORTANT: You should perform all procedures in the Utility Meter verification chapter.

2.12 Completing the Utility Meter Installation and Configuration

Make sure to close the Utility Meter GUI and log out from the Utility Meter system to complete the Utility Meter installation and configuration.

2.13 Upgrading the Utility Meter Software to Version 8.13

If you want to upgrade the Utility Meter software to version 8.13, you must install the 8.13 software and then configure all required Utility Meter parameters through the Utility Meter GUI. The Utility Meter parameters are entered from values provided in Appendix A “Site Preparation Form for Pay Per Use” or Appendix B “Site Preparation Form for Utility Ready Storage”.

NOTE: You do not need to uninstall previous versions of the Utility Meter software prior to version 8.13 installation.

If you are upgrading the Utility Meter software to 8.13, follow this procedure:

1.Copy the /etc/opt/meter/meter.xml file to a safe location. The meter.xml file contains the current Utility Meter configuration information and can be useful in case you need to reference the Utility Meter configuration information of the previous software version at a later time.

2.If the Utility Meter is configured to use the email data transport, move the existing sendmail configuration file to a safe location. (The default location is /etc/mail/sendmail.cf, but the existing sendmail configuration file can be in a different location.)

3.Stop the Utility Meter application by executing the following command:

# /opt/meter/bin/monitor stop

2.10 Configuring PPU Partitions and URS Devices 39

Image 39
Contents HP Utility Meter Users Guide for version Page Table of Contents Troubleshooting the Utility Meter Performing Utility Meter TasksVerifying Utility Meter Operation Site Preparation Form for Utility Ready Storage Site Preparation Form for Pay Per UsePage List of Figures Page Common Utility Meter Tasks Recommended Minimum Hardware List of TablesPage Document Organization About This DocumentIntended Audience Publishing HistoryCommon Utility Meter Tasks HP Encourages Your Comments Locating This GuideTypographic Conventions Related DocumentsPage Overview IntroductionIntroduction Swapping Utility Meter Hardware What is New for VersionReminder of What was New in Version Recommended HardwareEVA Supported URS PlatformsSupported PPU Platforms SoftwareUtility Meter Software Dependencies Utility Meter Software Back UpUtility Meter Directory Structure Installation and Support Services Data Sent to HPMissing Usage Reports Data Transport Methods Ordering Utility Pricing Solutions Web PortalIntroduction Installing and Configuring the Utility Meter Software Before Going to the Customer Site Skills RequiredInstalling the HP Systems Insight Manager Software Configuring the HP-UX System ParametersInstalling the Utility Meter Software # /usr/sbin/swinstall -s hostnamepathname T2805AA \ Usr/sbin/swinstall -s path-to-depotT2805AAUsr/sbin/swinstall -s path-to-depotT5462A # /usr/sbin/swinstall# /opt/meter/bin/monitor status Configuring the Utility Meter ParametersCompleting the Utility Meter Software Installation # /usr/sbin/shutdown -r# /usr/bin/X11/xclock # export DISPLAY=10.x.x.x0.0# /opt/meter/bin/umGUI Utility Meter GUI Main Window # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start # /opt/meter/bin/SetupCLI URS XP Only Installing the XP CV AE CLI SoftwareAvoiding CLI Conflicts Email Masquerading# /opt/meter/sbin/sendmail-config Automated email MasqueradingManual email Masquerading Verifying email Masquerading Try esmtp umeter@hostname.corp.example Try esmtp umeter@localhostUpgrading the Utility Meter Software to Version Configuring PPU Partitions and URS DevicesCompleting the Utility Meter Installation and Configuration Verifying the Utility Meter OperationInstalling and Configuring the Utility Meter Software Information Performing Utility Meter TasksUtility Meter GUI Main Window should appear Starting the Utility Meter GUIStarting the Utility Meter GUI Main Window Main Window Performing Utility Meter Tasks Utility Meter Help Information Utility Meter Configure Tasks Network Configuration Utility Meter Software Parameters To Change the Utility Meter Software Parameters # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Copy the Meters Configuration Load the Meter’s ConfigurationStorage Devices Namespace Configuration Port Protocol https Utility Meter Devices Tasks 10 Devices Tab Configure a Device Add DeviceAdd an EVA Device Performing Utility Meter Tasks Add an XP Device Performing Utility Meter Tasks Add a PPU Wbem Partition/Server 13 Add Device Dialog Box for PPU Wbem Partition/Server Change a non-URS Disk Array to URS Modify DevicePerforming Utility Meter Tasks View Device Change PPU Wbem Partition/Server Configuration ParametersRemove Device 17 View Device Error WindowDiscover Physical Devices Utility Meter Diagnose Tasks 20 Diagnose Tab Meter Connection StatusVerify Device Connection Device ConnectionDevice Connection PPU Wbem Partition/Server Page Transfer Data through CD Task # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Transfer Data through CD Task Performing Utility Meter Tasks Verifying the Utility Meter Software is Operational # /usr/bin/grep Error /etc/rc.logVerifying Utility Meter Operation Verifying the Utility Meter Hardware is OperationalVerifying the Correct Version of HP SIM is Installed Verifying the CIM Server Software Is Operational# /usr/sbin/swlist /usr/bin/grep -i sim # /usr/bin/kill -9 processid # /usr/bin/ps -ef /usr/bin/grep cim /usr/bin/grep -v grep# /opt/meter/bin/ConnectionTest Verifying Connectivity from the Utility Meter to HPData Transfer by Https # /opt/wbem/bin/osinfo# /usr/bin/mailq Data Transfer by emailVerifying the Utility Meter Data Transport Method Verify PPU Wbem Partition/Server ConfigurationVerify PPU Agent Configuration Verifying the Data Acquisition Server is RunningTest Connection from PPU Partition to UPS Web Portal Test Connection from PPU Agent to Utility MeterUPS Portal Welcome Page Verifying a Storage Device Verifying a Device is Configured in the Utility MeterVerifying the Connection from the Utility Meter to HP Verifying a Device is Connected to the Utility Meter# /usr/bin/rm /tmp/cli.out Device Manager CLI version# /usr/sbin/shutdown -R -H Troubleshooting the Utility MeterTroubleshooting Overview # /usr/bin/hostnameUtility Meter Software Troubleshooting a Storage Device Troubleshooting a DeviceVerifying the Correct Version of XP CV AE CLI is Installed Troubleshooting a Wbem DeviceFixing a Disconnected Device with Red Box Osinfo -hhostname -s-ulogin# /opt/meter/bin/monitor stop Table A-1 PPU Site Preparation Form Site Preparation Form for Pay Per UseNetworking details on the PPU Wbem Partition/Server Table B-1 PPU Networking Details Form Site Preparation Form for Utility Ready StorageNetworking Details for the Command View XP AE Server Networking Details for the Command View EVA Server 100 Cpuid Data Fields Sent from the Utility Meter to HPData Fields Sent from the Utility Meter to HP CLI Glossary104 Index Index