B Site Preparation Form for Utility Ready Storage

Use the Utility Meter Site Preparation Form below to plan the configuration of the Utility Meter URS installation. Items of interest are:

You can have up to 10 email addresses for the Contact email for Missing Data entries. HP recommends using an email alias in your corporate email system as the contact address for your Utility Meter. Enter the name of the alias (complete with domain name) as one of the email addresses. Only the meter email is currently being used. Other email addresses loaded into the meter tied to devices or partitions being monitored by the meter, are NOT currently being used and can be ignored. Use an email alias with a small number of contacts.

Ensure that the network's DNS server(s) tables contain the IP address and hostname of the Utility Meter.

If the data transport method is email, add the Utility Meter to the access list of the selected mail server.

This form below is for Utility Meter software version 8.13 on HP-UX. It needs to be completed by the customer and returned to their local HP contact before the URS installation starts. Please use one form per Utility Meter.

Table B-1 PPU Networking Details Form

Question

Does the customer accept the HP-UX preload (Foundation OE) on the Utility Meter or will he install his own HP-UX image (circle your choice)?

Short hostname for the Utility Meter:

Domain name for the Utility Meter:

LAN #1

IP address for LAN interface on the Utility Meter:

Network mask for IP address:

 

Gateway for IP address:

 

IP address of first DNS server:

 

IP address of second DNS

 

server (optional):

 

IP address of third DNS server

 

(optional):

 

Speed setting of port (circle your

10HD – 10FD – 100HD –

choice):

100FD – Auto

Time Zone for Utility Meter:

 

IP address of NTP server:

 

Email addresses or distribution list(s) of people at customer and/or at HP to be informed when Usage Reports do not arrive at HP:

Answer

Accept preload

Install own image

LAN #2

LAN #3

10HD – 10FD – 100HD –

10HD – 10FD – 100HD –

100FD – Auto

100FD – Auto

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

97

Image 97
Contents HP Utility Meter Users Guide for version Page Table of Contents Performing Utility Meter Tasks Troubleshooting the Utility MeterVerifying Utility Meter Operation Site Preparation Form for Utility Ready Storage Site Preparation Form for Pay Per UsePage List of Figures Page Common Utility Meter Tasks Recommended Minimum Hardware List of TablesPage Intended Audience About This DocumentPublishing History Document OrganizationCommon Utility Meter Tasks Typographic Conventions Locating This GuideRelated Documents HP Encourages Your CommentsPage Overview IntroductionIntroduction Reminder of What was New in Version What is New for VersionRecommended Hardware Swapping Utility Meter HardwareEVA Supported URS PlatformsSupported PPU Platforms SoftwareUtility Meter Software Back Up Utility Meter Software DependenciesUtility Meter Directory Structure Data Sent to HP Installation and Support ServicesMissing Usage Reports Data Transport Methods Ordering Utility Pricing Solutions Web PortalIntroduction Installing and Configuring the Utility Meter Software Before Going to the Customer Site Skills RequiredInstalling the HP Systems Insight Manager Software Configuring the HP-UX System ParametersInstalling the Utility Meter Software Usr/sbin/swinstall -s path-to-depotT5462A Usr/sbin/swinstall -s path-to-depotT2805AA# /usr/sbin/swinstall # /usr/sbin/swinstall -s hostnamepathname T2805AA \Completing the Utility Meter Software Installation Configuring the Utility Meter Parameters# /usr/sbin/shutdown -r # /opt/meter/bin/monitor status# export DISPLAY=10.x.x.x0.0 # /usr/bin/X11/xclock# /opt/meter/bin/umGUI Utility Meter GUI Main Window # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start # /opt/meter/bin/SetupCLI URS XP Only Installing the XP CV AE CLI SoftwareAvoiding CLI Conflicts Email MasqueradingAutomated email Masquerading # /opt/meter/sbin/sendmail-configManual email Masquerading Verifying email Masquerading Try esmtp umeter@hostname.corp.example Try esmtp umeter@localhostCompleting the Utility Meter Installation and Configuration Configuring PPU Partitions and URS DevicesVerifying the Utility Meter Operation Upgrading the Utility Meter Software to VersionInstalling and Configuring the Utility Meter Software Information Performing Utility Meter TasksUtility Meter GUI Main Window should appear Starting the Utility Meter GUIStarting the Utility Meter GUI Main Window Main Window Performing Utility Meter Tasks Utility Meter Help Information Utility Meter Configure Tasks Network Configuration Utility Meter Software Parameters To Change the Utility Meter Software Parameters # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Load the Meter’s Configuration Copy the Meters ConfigurationStorage Devices Namespace Configuration Port Protocol https Utility Meter Devices Tasks 10 Devices Tab Configure a Device Add DeviceAdd an EVA Device Performing Utility Meter Tasks Add an XP Device Performing Utility Meter Tasks Add a PPU Wbem Partition/Server 13 Add Device Dialog Box for PPU Wbem Partition/Server Change a non-URS Disk Array to URS Modify DevicePerforming Utility Meter Tasks View Device Change PPU Wbem Partition/Server Configuration ParametersRemove Device 17 View Device Error WindowDiscover Physical Devices Utility Meter Diagnose Tasks 20 Diagnose Tab Meter Connection StatusVerify Device Connection Device ConnectionDevice Connection PPU Wbem Partition/Server Page Transfer Data through CD Task # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Transfer Data through CD Task Performing Utility Meter Tasks Verifying Utility Meter Operation # /usr/bin/grep Error /etc/rc.logVerifying the Utility Meter Hardware is Operational Verifying the Utility Meter Software is OperationalVerifying the CIM Server Software Is Operational Verifying the Correct Version of HP SIM is Installed# /usr/sbin/swlist /usr/bin/grep -i sim # /usr/bin/kill -9 processid # /usr/bin/ps -ef /usr/bin/grep cim /usr/bin/grep -v grepData Transfer by Https Verifying Connectivity from the Utility Meter to HP# /opt/wbem/bin/osinfo # /opt/meter/bin/ConnectionTest# /usr/bin/mailq Data Transfer by emailVerify PPU Agent Configuration Verify PPU Wbem Partition/Server ConfigurationVerifying the Data Acquisition Server is Running Verifying the Utility Meter Data Transport MethodTest Connection from PPU Partition to UPS Web Portal Test Connection from PPU Agent to Utility MeterUPS Portal Welcome Page Verifying a Storage Device Verifying a Device is Configured in the Utility MeterVerifying the Connection from the Utility Meter to HP Verifying a Device is Connected to the Utility Meter# /usr/bin/rm /tmp/cli.out Device Manager CLI versionTroubleshooting Overview Troubleshooting the Utility Meter# /usr/bin/hostname # /usr/sbin/shutdown -R -HUtility Meter Software Troubleshooting a Storage Device Troubleshooting a DeviceVerifying the Correct Version of XP CV AE CLI is Installed Troubleshooting a Wbem DeviceFixing a Disconnected Device with Red Box Osinfo -hhostname -s-ulogin# /opt/meter/bin/monitor stop Table A-1 PPU Site Preparation Form Site Preparation Form for Pay Per UseNetworking details on the PPU Wbem Partition/Server Table B-1 PPU Networking Details Form Site Preparation Form for Utility Ready StorageNetworking Details for the Command View XP AE Server Networking Details for the Command View EVA Server 100 Cpuid Data Fields Sent from the Utility Meter to HPData Fields Sent from the Utility Meter to HP CLI Glossary104 Index Index