HP Pay per use (PPU) Main Window, # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start

Page 44

1.# /opt/meter/bin/monitor stop

2.# /opt/meter/bin/monitor start

The Utility Meter GUI, provides the following main screens (tabs):

GettingStarted — Provides help information about Utility Meter tasks — see Utility Meter Help Information

Configure — Initially configure or modify the Utility Meter software parameters, copy the Utility Meter's current configuration to a file for backup or recovery purposes, and add a namespace configuration for a device — see Utility Meter Configure Tasks

Devices — Manage (add, modify, view, and remove) and discover metered entities — see Utility Meter Devices Tasks

Diagnose — Verify that the Utility Meter's data acquisition server (das_SERVER process) is running and test the connection to a device — see Utility Meter Diagnose Tasks

If you know the task tab you want to access before you start the Utility Meter GUI, you can use the options below.

Table 3-2 Starting the Utility Meter GUI with Specific Tabs

Option

Tab

0 or no option

GettingStarted

1

Configure

2

Devices

3

Diagnose

For example, to start the Utility Meter GUI with the Configure tab selected, execute the following command:

#/opt/meter/bin/umGUI 1

3.2The Main Window

The Utility Meter GUI main window has two panes.

The Managed Devices pane on the left lists the storage and PPU devices that are configured in the Utility Meter.

The Tasks pane on the right displays a set of tasks you can accomplish depending on the tab selected. You click the appropriate task button in the Tasks pane to perform the task.

44 Performing Utility Meter Tasks

Image 44
Contents HP Utility Meter Users Guide for version Page Table of Contents Verifying Utility Meter Operation Troubleshooting the Utility MeterPerforming Utility Meter Tasks Site Preparation Form for Pay Per Use Site Preparation Form for Utility Ready StoragePage List of Figures Page List of Tables Common Utility Meter Tasks Recommended Minimum HardwarePage About This Document Intended AudiencePublishing History Document OrganizationCommon Utility Meter Tasks Locating This Guide Typographic ConventionsRelated Documents HP Encourages Your CommentsPage Introduction OverviewIntroduction What is New for Version Reminder of What was New in VersionRecommended Hardware Swapping Utility Meter HardwareSupported URS Platforms EVASoftware Supported PPU PlatformsUtility Meter Directory Structure Utility Meter Software DependenciesUtility Meter Software Back Up Missing Usage Reports Installation and Support ServicesData Sent to HP Data Transport Methods Utility Pricing Solutions Web Portal OrderingIntroduction Installing and Configuring the Utility Meter Software Skills Required Before Going to the Customer SiteConfiguring the HP-UX System Parameters Installing the HP Systems Insight Manager SoftwareInstalling the Utility Meter Software Usr/sbin/swinstall -s path-to-depotT2805AA Usr/sbin/swinstall -s path-to-depotT5462A# /usr/sbin/swinstall # /usr/sbin/swinstall -s hostnamepathname T2805AA \Configuring the Utility Meter Parameters Completing the Utility Meter Software Installation# /usr/sbin/shutdown -r # /opt/meter/bin/monitor status# /opt/meter/bin/umGUI # /usr/bin/X11/xclock# export DISPLAY=10.x.x.x0.0 Utility Meter GUI Main Window # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start URS XP Only Installing the XP CV AE CLI Software # /opt/meter/bin/SetupCLIEmail Masquerading Avoiding CLI ConflictsManual email Masquerading # /opt/meter/sbin/sendmail-configAutomated email Masquerading Verifying email Masquerading Try esmtp umeter@localhost Try esmtp umeter@hostname.corp.exampleConfiguring PPU Partitions and URS Devices Completing the Utility Meter Installation and ConfigurationVerifying the Utility Meter Operation Upgrading the Utility Meter Software to VersionInstalling and Configuring the Utility Meter Software Performing Utility Meter Tasks InformationStarting the Utility Meter GUI Utility Meter GUI Main Window should appearStarting the Utility Meter GUI Main Window Main Window Performing Utility Meter Tasks Utility Meter Help Information Utility Meter Configure Tasks Network Configuration Utility Meter Software Parameters To Change the Utility Meter Software Parameters # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Storage Devices Namespace Configuration Copy the Meters ConfigurationLoad the Meter’s Configuration Port Protocol https Utility Meter Devices Tasks Configure a Device Add Device 10 Devices TabAdd an EVA Device Performing Utility Meter Tasks Add an XP Device Performing Utility Meter Tasks Add a PPU Wbem Partition/Server 13 Add Device Dialog Box for PPU Wbem Partition/Server Modify Device Change a non-URS Disk Array to URSPerforming Utility Meter Tasks Change PPU Wbem Partition/Server Configuration Parameters View Device17 View Device Error Window Remove DeviceDiscover Physical Devices Utility Meter Diagnose Tasks Meter Connection Status 20 Diagnose TabDevice Connection Verify Device ConnectionDevice Connection PPU Wbem Partition/Server Page Transfer Data through CD Task # /opt/meter/bin/monitor stop # /opt/meter/bin/monitor start Transfer Data through CD Task Performing Utility Meter Tasks # /usr/bin/grep Error /etc/rc.log Verifying Utility Meter OperationVerifying the Utility Meter Hardware is Operational Verifying the Utility Meter Software is Operational# /usr/sbin/swlist /usr/bin/grep -i sim Verifying the Correct Version of HP SIM is InstalledVerifying the CIM Server Software Is Operational # /usr/bin/ps -ef /usr/bin/grep cim /usr/bin/grep -v grep # /usr/bin/kill -9 processidVerifying Connectivity from the Utility Meter to HP Data Transfer by Https# /opt/wbem/bin/osinfo # /opt/meter/bin/ConnectionTestData Transfer by email # /usr/bin/mailqVerify PPU Wbem Partition/Server Configuration Verify PPU Agent ConfigurationVerifying the Data Acquisition Server is Running Verifying the Utility Meter Data Transport MethodTest Connection from PPU Agent to Utility Meter Test Connection from PPU Partition to UPS Web PortalUPS Portal Welcome Page Verifying a Device is Configured in the Utility Meter Verifying a Storage DeviceVerifying a Device is Connected to the Utility Meter Verifying the Connection from the Utility Meter to HPDevice Manager CLI version # /usr/bin/rm /tmp/cli.outTroubleshooting the Utility Meter Troubleshooting Overview# /usr/bin/hostname # /usr/sbin/shutdown -R -HUtility Meter Software Troubleshooting a Device Troubleshooting a Storage DeviceTroubleshooting a Wbem Device Verifying the Correct Version of XP CV AE CLI is InstalledOsinfo -hhostname -s-ulogin Fixing a Disconnected Device with Red Box# /opt/meter/bin/monitor stop Site Preparation Form for Pay Per Use Table A-1 PPU Site Preparation FormNetworking details on the PPU Wbem Partition/Server Site Preparation Form for Utility Ready Storage Table B-1 PPU Networking Details FormNetworking Details for the Command View XP AE Server Networking Details for the Command View EVA Server 100 Data Fields Sent from the Utility Meter to HP CpuidData Fields Sent from the Utility Meter to HP Glossary CLI104 Index Index