HP Performance Optimized Data Center (POD) 20cp manual Electrical power system configuration

Page 15

These actions must be performed for all associated parts of the electrical power train. The majority of the details and factors required to complete these studies are associated with the existing installed facility infrastructure.

CAUTION: Failure to complete these studies can cause serious issues with the electrical integration of the POD into your electrical system.

Electrical power system configuration

A preliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision concerning capacity limitations and the impacts of this decision on the electrical design.

A 1N electrical configuration can be achieved by providing all of the required electrical feeders from a common power source, common switchboards, and transformers.

A 2N electrical configuration can be achieved by feeding parallel power paths from independent power sources, switchboards, and transformers.

Site requirements 15

Image 15
Contents Part Number March Edition AbstractPage Contents HP POD 20c site assessment checklist Project coordination Site planning HP POD 20c installationSafety and NEC compliance OverviewAbout this document Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Drainage Requirement Location SpecificationUtilities Humidifier water supplyChilled water supply Power infrastructure installation Piping materialsSite electrical system Electrical power system configuration Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierHP POD 20c access control Fire, safety, and access notificationsDemarcation box Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialSafety and NEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty information Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb