Index
A
about this guide 5
areas prone to lightning or power surges 20 assembly 28
assembly area 22
C
capacity limitations 7 clearance area 8
cold weather considerations 20 communication connections 18 connection portals 16 connections, additional 16 connections, facility 16
D
delivery considerations 28 dimensions 8
drainage 12
E
electrical power capacity 7 electrical system 14, 15 environmental considerations 20 environmental control system (ECS) 16 environmental risks 20
equipment, installation 22
F
facility connections 16 fire and safety 18 fire suppression 6 future expansions 10
G
grounding requirements 11
H
HP site preparation drawing package 21
humidifier 12, 17
I
installation 22 installation equipment 22
L
lifting layout and requirements 22 lightning protection 20
M
materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 32
O
other objects 24 overview 5
P
permit requirements 21 piping materials 14
power infrastructure installation 14 power surges 20
preparing for assembly 28 project coordination 21
R
regulatory compliance identification numbers 32 regulatory compliance notices 32
regulatory compliance, HP POD 20c 5, 31
S
safety information 6, 32 security 6, 18 seismic activity 20
site assessment 6, 21, 25 site assessment checklist 25 site pad 8
Index 36