HP Performance Optimized Data Center (POD) 20cp manual Index

Page 36

Index

A

about this guide 5

areas prone to lightning or power surges 20 assembly 28

assembly area 22

C

capacity limitations 7 clearance area 8

cold weather considerations 20 communication connections 18 connection portals 16 connections, additional 16 connections, facility 16

D

delivery considerations 28 dimensions 8

drainage 12

E

electrical power capacity 7 electrical system 14, 15 environmental considerations 20 environmental control system (ECS) 16 environmental risks 20

equipment, installation 22

F

facility connections 16 fire and safety 18 fire suppression 6 future expansions 10

G

grounding requirements 11

H

HP site preparation drawing package 21

humidifier 12, 17

I

installation 22 installation equipment 22

L

lifting layout and requirements 22 lightning protection 20

M

materials, piping 14 mechanical cooling capacity 7 modifications, FCC notice 32

O

other objects 24 overview 5

P

permit requirements 21 piping materials 14

power infrastructure installation 14 power surges 20

pre-delivery 28

preparing for assembly 28 project coordination 21

R

regulatory compliance identification numbers 32 regulatory compliance notices 32

regulatory compliance, HP POD 20c 5, 31

S

safety information 6, 32 security 6, 18 seismic activity 20

site assessment 6, 21, 25 site assessment checklist 25 site pad 8

Index 36

Image 36
Contents Abstract Part Number March EditionPage Contents Project coordination Site planning HP POD 20c installation HP POD 20c site assessment checklistSafety and NEC compliance OverviewAbout this document Site safety and security Feature SpecificationSite assessment Site preparationElectrical power capacities critical IT power HP POD 20c capacitiesHP POD 20c capacity limitations Overall system capacitiesHP POD 20c weight Dimensions and clearancesSite requirements Site padSite requirements Future expansions Grounding requirements Requirement Location Specification UtilitiesHumidifier water supply DrainageChilled water supply Power infrastructure installation Piping materialsSite electrical system Electrical power system configuration Supported facility connections Environmental control systemAdditional POD connections Connection portalsHumidifier End view shownHP POD 20c access control Fire, safety, and access notificationsDemarcation box Supported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationHP POD 20c site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial Power Requirements Description Initial General Description InitialSafety and NEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty information Glossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb