HP Performance Optimized Data Center (POD) 20cp manual Power infrastructure installation

Page 14

Feature

Specification

 

 

Facility input temperature to the HP POD

12º to 24ºC (55º to 75ºF)

20c

 

Max design pressure

1,034 kPa (150 psi)

HP POD 20c pressure drop

172.4 kPa (25 psi)

HP POD 20c water flow rate

454 lpm (120 gpm*)

Chilled water supply and return

Two 7.62 cm (3 in) ASME B16.5

connections

class #150 flanges

*Measurement is in US gallons per minute.

Piping materials

Do not use the following interconnecting piping materials in a closed water system:

Oxidizing biocides

Aluminum components

Brass components with high levels of zinc

Non-stainless steel iron components

PVC

IMPORTANT: Even though some PVC grade piping materials are designed to handle the expected water pressure, the use of PVC materials should be reviewed and approved by the customer site engineers.

Power infrastructure installation

When determining the final location of the power connections, consider the following:

Distance between the facility utilities and the location of the HP POD 20c

Distance between possible UPS or generator locations and the HP POD 20c

Requirements for routing electrical feeders (underground or overhead)

The facility power connection must be installed in compliance with local electrical codes and regulations. HP reference electrical installation design is based on a maximum distance of 15.2 m (50 ft) or a line of sight between the disconnect and the HP POD 20c.

Site electrical system

To ensure a complete and safe integration of the HP POD solution with your facility, HP requires that you complete the following actions for the installed electrical system prior to the installation of the HP POD solution:

Short circuit analysis

Arc flash study

Circuit breaker coordination study

Site requirements 14

Image 14
Contents Abstract Part Number March EditionPage Contents Project coordination Site planning HP POD 20c installation HP POD 20c site assessment checklistAbout this document Safety and NEC complianceOverview Site assessment Site safety and securityFeature Specification Site preparationHP POD 20c capacity limitations Electrical power capacities critical IT powerHP POD 20c capacities Overall system capacitiesSite requirements HP POD 20c weightDimensions and clearances Site padSite requirements Future expansions Grounding requirements Humidifier water supply Requirement Location SpecificationUtilities DrainageChilled water supply Site electrical system Power infrastructure installationPiping materials Electrical power system configuration Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsHumidifier End view shownDemarcation box HP POD 20c access controlFire, safety, and access notifications Supported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 20c installation Site planningAssembly equipment locations Description HP POD 20c storage requirementsAdditional structures HP POD 20c site assessment checklist Appendix a HP site assessmentDescription Yes Initial Used as the basis for the evaluation. The delivery path isCustomer responsibilities Description Initial InformationAppendix B Preparing for delivery HP POD 20c site readiness checklistInstallation prerequisites Pre-delivery tasksChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial Power Requirements Description Initial General Description InitialHP POD 20c regulatory compliance Safety and NEC complianceAppendix C Regulatory compliance notices Safety and regulatory compliance Warranty information Glossary Uninterruptible power system Very early smoke detection apparatusDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb