HP Performance Optimized Data Center (POD) 20cp manual Appendix C Regulatory compliance notices

Page 31

Appendix C: Regulatory compliance notices

HP POD 20c regulatory compliance

The HP POD 20c complies with the following regulatory standards.

Standard

Certification level

Standard title

 

 

 

UL 60950

ETL "Listed"

UL 60950—Standard for Safety Information Technology

 

 

Equipment, Part 1: General Requirements, Issue: 2007/03/27,

 

 

Edition: 2

 

 

UL 60950—Standard for Safety Information Technology

 

 

Equipment, Part 22: Equipment to be Installed Outdoors, Issue:

 

 

2007/04/23, Edition: 1

 

 

 

NFPA 70

ETL "Classified"

NFPA 70—National Electric Code, 2008 Edition, © 2008 National

 

 

Fire Protection Association

NFPA 72

Designed to Comply

National Fire Alarm code, 2007 Edition, © 2006 National Fire

 

With applicable

Protection Association

 

requirements

 

NFPA 2001

Designed to Comply

NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems,

 

With applicable

2008 Edition, © 2008 National Fire Protection Association

 

requirements

 

IBC 2009

Designed to Comply

2009 International Building Code, © 2010 International Code

 

With applicable

Council, Inc.

 

requirements

 

Safety and NEC compliance

The HP POD 20c is certified to UL 69050-1/IEC 60950-22 as an Information Technology Product and classified according to the National Electric Code NFPA 70. For more information, see "HP POD 20c regulatory compliance (on page 31)."

The HP POD 20c is not suitable for long-term human occupancy. The HP POD 20c is Listed as a Product that provides service access areas for periodic maintenance and service. These areas must be used only by owner-authorized and qualified personnel who are trained in the maintenance and service of the HP POD 20c components.

IMPORTANT: Before installing the HP POD 20c, consult your local AHJ for applicable regulations and to review site-specific location guidelines. If needed, obtain any necessary permits.

Additional considerations for safety and NEC compliance are as follows:

The HP POD 20c is listed as an Information Technology Product to UL 60950.

The HP POD 20c is evaluated as a "non-inhabitable product" that provides "service access" areas for customer-authorized, qualified, and trained service personnel.

The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an existing facility, and are not suitable as "service entrance" for connection to the utility.

Appendix C: Regulatory compliance notices 31

Image 31
Contents Part Number March Edition AbstractPage Contents HP POD 20c site assessment checklist Project coordination Site planning HP POD 20c installationOverview Safety and NEC complianceAbout this document Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Drainage Requirement Location SpecificationUtilities Humidifier water supplyChilled water supply Piping materials Power infrastructure installationSite electrical system Electrical power system configuration Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierFire, safety, and access notifications HP POD 20c access controlDemarcation box Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryGeneral Water Supply Description Initial Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialAppendix C Regulatory compliance notices Safety and NEC complianceHP POD 20c regulatory compliance Safety and regulatory compliance Warranty information Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb