Contents |
|
Overview | 5 |
About this document | 5 |
Safety and NEC compliance | 5 |
Site assessment | 6 |
Site preparation | 6 |
Site safety and security | 6 |
Fire detection and suppression | 6 |
HP POD 20c capacities | 7 |
HP POD 20c capacity limitations | 7 |
Electrical power capacities (critical IT power) | 7 |
Mechanical cooling capacities | 7 |
Overall system capacities | 7 |
Site requirements | 8 |
Site pad | 8 |
HP POD 20c weight | 8 |
Dimensions and clearances | 8 |
Future expansions | 10 |
Grounding requirements | 11 |
Utilities | 12 |
Humidifier water supply | 12 |
Drainage | 12 |
Chilled water supply | 13 |
Piping materials | 14 |
Power infrastructure installation | 14 |
Site electrical system | 14 |
Electrical power system configuration | 15 |
Supported facility connections | 16 |
Environmental control system | 16 |
Additional POD connections | 16 |
Connection portals | 16 |
Humidifier | 17 |
HP POD 20c access control | 18 |
Fire, safety, and access notifications | 18 |
Demarcation box | 18 |
Environmental considerations | 20 |
Environmental risks | 20 |
Cold weather | 20 |
Areas prone to lightning or power surges | 20 |
Seismic activity | 20 |
Site plan requirements and actions | 21 |
Completing a site assessment | 21 |
HP Site Preparation Drawing Package | 21 |
Zoning and permit requirements | 21 |
Contents | 3 |