HP Performance Optimized Data Center (POD) 20cp manual Contents

Page 3

Contents

 

Overview

5

About this document

5

Safety and NEC compliance

5

Site assessment

6

Site preparation

6

Site safety and security

6

Fire detection and suppression

6

HP POD 20c capacities

7

HP POD 20c capacity limitations

7

Electrical power capacities (critical IT power)

7

Mechanical cooling capacities

7

Overall system capacities

7

Site requirements

8

Site pad

8

HP POD 20c weight

8

Dimensions and clearances

8

Future expansions

10

Grounding requirements

11

Utilities

12

Humidifier water supply

12

Drainage

12

Chilled water supply

13

Piping materials

14

Power infrastructure installation

14

Site electrical system

14

Electrical power system configuration

15

Supported facility connections

16

Environmental control system

16

Additional POD connections

16

Connection portals

16

Humidifier

17

HP POD 20c access control

18

Fire, safety, and access notifications

18

Demarcation box

18

Environmental considerations

20

Environmental risks

20

Cold weather

20

Areas prone to lightning or power surges

20

Seismic activity

20

Site plan requirements and actions

21

Completing a site assessment

21

HP Site Preparation Drawing Package

21

Zoning and permit requirements

21

Contents

3

Image 3
Contents Part Number March Edition AbstractPage Contents HP POD 20c site assessment checklist Project coordination Site planning HP POD 20c installationSafety and NEC compliance OverviewAbout this document Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Drainage Requirement Location SpecificationUtilities Humidifier water supplyChilled water supply Power infrastructure installation Piping materialsSite electrical system Electrical power system configuration Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierHP POD 20c access control Fire, safety, and access notificationsDemarcation box Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryDescription Initial General Water Supply Description InitialChilled Water Supply Description Initial General Description Initial Power Requirements Description InitialSafety and NEC compliance Appendix C Regulatory compliance noticesHP POD 20c regulatory compliance Safety and regulatory compliance Warranty information Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb