HP Performance Optimized Data Center (POD) 20cp manual Grounding requirements

Page 11

Grounding requirements

The HP POD 20c structure and internal components are all bonded together. A common grounding electrode conductor connection point is provided on the utility-end of the hot aisle.

WARNING: To avoid the risk of personal injury or electric shock, the HP POD 20c must be properly grounded (earthed) in accordance with national, regional, and local regulations.

The following is a list of component requirements for grounding and bonding:

Grounding of the HP POD 20c must comply with the requirements of Article 250 of the NEC, NFPA 70-2008/2011 (NA/JPN).

Bonding of the piping systems and any exposed structural steel that is installed to support the HP POD 20c must be in accordance with the NEC (NA).

Grounding feature

Specification

 

 

Grounding electrode

The grounding electrode conductor connection bus pad is located on the outside of

conductor pad

the HP POD 20c on the hot aisle side of the utility end of the POD and below the

 

transformer cabinet.

 

The grounding pad must be connected to the grounding electrode system or

 

building steel in accordance with Article 250 of the NEC or equivalent regional

 

regulation.

 

 

Grounding lugs

Grounding lugs cannot be attached to any painted surface.

 

Grounding lugs must be compression-type 2-hole lugs and UL listed specifically for

 

grounding.

 

 

Ground rod system or

The customer must provide an effective grounding system with a ground rod or a

ground well

ground well.

IMPORTANT: Before installing the HP POD 20c, consult your local AHJ for applicable regulations and to review site-specific location guidelines. If needed, obtain any necessary permits.

The following figure shows the grounding electrode conductor connection that is located on the cold aisle of the HP POD 20c.

Side view shown

Site requirements 11

Image 11
Contents Part Number March Edition AbstractPage Contents HP POD 20c site assessment checklist Project coordination Site planning HP POD 20c installationAbout this document Safety and NEC complianceOverview Site preparation Site safety and securityFeature Specification Site assessmentOverall system capacities Electrical power capacities critical IT powerHP POD 20c capacities HP POD 20c capacity limitationsSite pad HP POD 20c weightDimensions and clearances Site requirementsSite requirements Future expansions Grounding requirements Drainage Requirement Location SpecificationUtilities Humidifier water supplyChilled water supply Site electrical system Power infrastructure installationPiping materials Electrical power system configuration Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsEnd view shown HumidifierDemarcation box HP POD 20c access controlFire, safety, and access notifications Supported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialPre-delivery tasks HP POD 20c site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial General Description Initial Power Requirements Description InitialHP POD 20c regulatory compliance Safety and NEC complianceAppendix C Regulatory compliance notices Safety and regulatory compliance Warranty information Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb