HP Performance Optimized Data Center (POD) 20cp manual Overview, About this document

Page 5

Overview

About this document

This document outlines the site and preparation requirements for a 6 m (20 ft) HP POD 20c as it is being released in North America. The customer must provide a qualified architectural or consulting engineering team to generate site-specific documents for each HP POD 20c installation, including final site drawings. The customer site installation design must comply with all national, regional, and local regulations, ordinances, codes, and the specifications that are listed in this document.

This guide is part of the core documentation for the HP POD 20c. The actual location of various components or included subsystems and their operation for your site-specific HP POD 20c might vary from what is described in this document. For information that is specific to your HP POD 20c, see the drawings included in the Operations and Maintenance Manual for the HP Performance Optimized Datacenter 20c, or contact HP.

Safety and NEC compliance

The HP POD 20c is certified to UL 69050-1/IEC 60950-22 as an Information Technology Product and classified according to the National Electric Code NFPA 70. For more information, see "HP POD 20c regulatory compliance (on page 31)."

The HP POD 20c is not suitable for long-term human occupancy. The HP POD 20c is Listed as a Product that provides service access areas for periodic maintenance and service. These areas must be used only by owner-authorized and qualified personnel who are trained in the maintenance and service of the HP POD 20c components.

IMPORTANT: Before installing the HP POD 20c, consult your local AHJ for applicable regulations and to review site-specific location guidelines. If needed, obtain any necessary permits.

Additional considerations for safety and NEC compliance are as follows:

The HP POD 20c is listed as an Information Technology Product to UL 60950.

The HP POD 20c is evaluated as a "non-inhabitable product" that provides "service access" areas for customer-authorized, qualified, and trained service personnel.

The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an existing facility, and are not suitable as "service entrance" for connection to the utility.

The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment, in restricted access locations, with field wiring terminals provided for permanent supply connections.

The HP POD 20c meets the following ratings.

Feature

Specification

 

 

Category

Rated Overvoltage Category III

Protection

Surge protection device

Overview 5

Image 5
Contents Part Number March Edition AbstractPage Contents HP POD 20c site assessment checklist Project coordination Site planning HP POD 20c installationAbout this document Safety and NEC complianceOverview Feature Specification Site safety and securitySite assessment Site preparationHP POD 20c capacities Electrical power capacities critical IT powerHP POD 20c capacity limitations Overall system capacitiesDimensions and clearances HP POD 20c weightSite requirements Site padSite requirements Future expansions Grounding requirements Utilities Requirement Location SpecificationHumidifier water supply DrainageChilled water supply Site electrical system Power infrastructure installationPiping materials Electrical power system configuration Environmental control system Supported facility connectionsAdditional POD connections Connection portalsEnd view shown HumidifierDemarcation box HP POD 20c access controlFire, safety, and access notifications Supported facility connections Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 20c installationHP POD 20c storage requirements Assembly equipment locations DescriptionAdditional structures Appendix a HP site assessment HP POD 20c site assessment checklistUsed as the basis for the evaluation. The delivery path is Description Yes InitialInformation Customer responsibilities Description InitialInstallation prerequisites HP POD 20c site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksChilled Water Supply Description Initial Description InitialGeneral Water Supply Description Initial General Description Initial Power Requirements Description InitialHP POD 20c regulatory compliance Safety and NEC complianceAppendix C Regulatory compliance notices Safety and regulatory compliance Warranty information Glossary Very early smoke detection apparatus Uninterruptible power systemDocumentation feedback Index Index
Related manuals
Manual 86 pages 43.14 Kb Manual 22 pages 15.98 Kb Manual 81 pages 57.33 Kb Manual 38 pages 28.4 Kb