OIL
SEPARATOR
DESICCANT
BED
PURGE
ORIFICE
PURGE
VOLUME
CONTROL
PORT
PURGE
CONTROL
LINE
SUPPLY
PORT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| DELIVERY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
GOVERNOR |
|
|
|
|
|
|
|
|
|
|
|
|
|
| CHECK VALVE |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| DISCHARGE | |
|
|
|
|
|
|
|
|
|
|
|
|
|
| PORT | |
|
| ENGINE |
|
|
|
|
|
|
|
|
| PURGE | |||
|
|
|
| TURBO |
|
|
| EXHAUST |
| ||||||
COMPRESSOR | TURBO |
| VALVE | ||||||||||||
|
|
|
|
FIGURE 3 - BENDIX® AD-IP® INTEGRAL PURGE AIR DRYER PURGE CYCLE
Note: the early end cover designs incorporated a vertical delivery check valve while the newer versions have a horizontal check valve. Both have the same function, but the components are not interchangeable. See Figure 4.
A small amount of the air flowing through the center of the desiccant cartridge bolt flows out the cross drilled purge orifice and into the purge volume, for regenerating the desiccant. The air dryer will remain in the charge cycle until the air brake system pressure builds to the governor
PURGE CYCLE (Refer to Figure 3)
As air brake system pressure reaches the
moves in response to air pressure causing the purge valve to open to the atmosphere and the turbo
The desiccant cartridge decompression lasts only a few seconds and is evidenced by an audible burst of air at the
5