Lochinvar 90, 500 service manual Venting

Page 15

2Venting (continued)

Locate appliance as close as possible to a chimney or gas vent.

Avoid long horizontal runs of the vent pipe, 90° elbows, reductions and restrictions. Horizontal portions of the venting system shall be supported to prevent sagging. Horizontal runs must slope upwards not less than 1/4 inch per foot (21 mm/m) from the appliance to the vent terminal. Follow manufacturer’s instructions.

Do not use an existing chimney as a raceway for a flue pipe if another appliance or fireplace is vented through the chimney.

The weight of the venting system must not rest on the appliance. Adequate support of the venting system must be provided in compliance with local codes and other applicable codes. All connections should be secured with rustproof sheet metal screws.

Vent connectors serving appliances vented by natural draft shall not be connected to any portion of a mechanical draft system operating under positive pressure. Connection to a positive pressure chimney may cause flue products to be discharged into the living space causing serious health injury.

Common venting systems may be too large when an existing appliance is removed. At the time of removal of an existing appliance, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while other appliances remaining connected to the common venting system are not in operation.

(a)Seal any unused opening in the common venting system.

(b)Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.

(c)Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any other appliances not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

(d)Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.

Installation & Service Manual

(e)Test for spillage at the draft hood/relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar or pipe.

(f)After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and other gas burning appliances to their previous conditions of use.

(g)Any improper operation of the common venting system should be corrected so that the installation conforms to the latest edition of the National Fuel Gas Code, ANSI Z223.1. In Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 11 in the latest edition of the National Fuel Gas Code, ANSI Z223.1. In Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment.

15

Image 15
Contents Models 90,000 500,000 Btu/hr Contents Checking equipment Please read before proceedingCodes Copper-fin =B=R Rating RatingsCopper-fin Specifications Gas connection pipe Copper-fin How it worksModels CWN270 Front View Model CWN399 Front View 422 Location of unit Determine unit location3Combustion Air Direct from Outside Determine boiler location6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesNumber Masonry Chimney InstallationVent Materials Sidewall Venting7CB with Vent Damper and Vent Damper Terminal Block Automatic Vent DamperManifold Pressure Gas connectionsGas Supply Gas Pressure Test Gas ConnectionGas Piping Install Piping to ControlClockwise to raise regulator gas pressure, counterclockwise Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Hydronic pipingRelief Valve General Plumbing Rules Typical Heating Boiler InstallationsLow Water Cutoff if equipped Minimum Required Flow For Heating BoilerPiping of the Boiler System System Temperature Rise ChartCirculator Pump Requirements Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Water Connections Heating Boilers OnlyPrimary/Secondary Boiler Piping Boiler Flow Rates Three Way Valves4Primary / Secondary Piping of a Single Boiler Primary / Secondary PipingNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Electrical connections Terminal Strip WiringBoiler Operating Temperature Control Power Venter Connection to Terminal StripTemperature Adjustment Pump Wiring for a Heating BoilerOperating Temperature Control Maximum Set Point Determination Locating Temperature ControlTemperature Control Settings Maximum SET Point DeterminationOutdoor Air Temperature Sensor Temperature Control SensorsInlet Water Temperature Sensor Multi-Purpose Temperature SensorOutdoor Air Reset Option Installation of a Remote Sensor Boiler ApplicationInstallation of a Tank Sensor Water Heater Application Additional Temperature Controls Manual Reset High Water Temperature Limit Control Blocked Vent and Flame Roll-Out / Flame Interlock SwitchPre-start Checklist Start-upInitial Start-up 1Gas Valve 90,000 270,000 Btu/hr Models Lighting InstructionsTo Turn OFF GAS to Appliance Safety Shutoff Test For Standing Pilot Ignition SystemOperating Instructions To Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemIntermittent Pilot Spark Ignition System F9/M9 Freeze ProtectionFreeze Protection for a Heating Boiler System if required Water TreatmentDomestic Water Heaters 90,000 500,000 Btu/hr Models Required Temperature RiseRequired Temperature Rise Domestic water heatersWater Chemistry Softened Water SystemsPump Operation 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Heat Exchanger Remote Sensor InstallationThermostat Settings Minimum Pump Performance5Danger Warning Cathodic Protection Water Flow Switch if equippedPressure Only Relief Valve Thermal ExpansionSee the User’s Information Manual for instructions Maintenance and annual startupService technician Owner maintenanceMaintenance Check Relief Valve Check Expansion TankPerform Start-up and Checks Check All WiringCheck Control Settings Combustion Air AdjustmentInspect and Clean Burner Heat Exchanger / Burner AccessInspection and Cleaning Procedure Water Circulating Pump Pilot Flame Adjustment ProcedureClear Area Inspection of Heat Exchanger WaterwaysGas Train and Controls Review with ownerTroubleshooting Pilot or replace 90,000 270,000 Btu/hr Models DiagramsSchematic Diagram F1 Unit Wiring Diagram F1 UnitSchematic Diagram F9 Unit Wiring Diagram F9 Unit315,000 399,999 Btu/hr Models Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10