Lochinvar 500, 90 service manual Codes

Page 4

Installation & Service Manual

Please read before proceeding

￿WARNING

To minimize the possibility of serious personal injury, fire, or damage to your appliance, never violate the following safety rules:

1.Boilers and water heaters are heat producing appliances. To avoid damage or injury, do not store materials against the appliance or the vent-air intake system. Use proper care to avoid unnecessary contact (especially children) with the appliance and vent-air intake components.

2.Never cover your appliance, lean anything against it, store trash or debris near it, stand on it or in any way block the flow of fresh air to your appliance.

3.UNDER NO CIRCUMSTANCES must flammable materials such as gasoline or paint thinner be used or stored in the vicinity of this appliance, vent-air intake system or any location from which fumes could reach the appliance or vent-air intake system.

Codes –

The equipment shall be installed in accordance with those installation regulations in force in the local area where the installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made. In the absence of such requirements, the installation shall conform to the latest edition of the National Fuel Gas Code, ANSI Z223.1. Where required by the authority having jurisdiction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, ASME CSD-1. All boilers conform to the latest edition of the ASME Boiler and Pressure Vessel Code, Section IV. Where required by the authority having jurisdiction, the installation must comply with the Canadian Association Code, CAN/CGA- B149.1 and/or local codes.

This appliance meets the safe lighting performance criteria with the gas manifold and control assembly provided as specified in the ANSI standards for gas-fired appliances, ANSI Z21.13 and ANSI Z21.10.3.

4

Image 4
Contents Models 90,000 500,000 Btu/hr Contents Please read before proceeding Checking equipmentCodes Ratings Copper-fin =B=R RatingCopper-fin Specifications Copper-fin How it works Gas connection pipeModels CWN270 Front View Model CWN399 Front View 422 Determine unit location Location of unitDetermine boiler location 3Combustion Air Direct from Outside6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Conventional Negative Draft Venting System VentingVent Pipe Sizes Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallMasonry Chimney Installation Vent MaterialsSidewall Venting NumberAutomatic Vent Damper 7CB with Vent Damper and Vent Damper Terminal BlockGas connections Gas Supply Gas Pressure TestGas Connection Manifold PressureInstall Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure Clockwise to raise regulator gas pressure, counterclockwiseChecking Gas Supply Pressure 4Gas Supply PressureVenting of Combination Gas Valves Combination Gas ValvesTwo Stage Burner Control System Hydronic piping Water Flow Switch if equippedRelief Valve Typical Heating Boiler Installations Low Water Cutoff if equippedMinimum Required Flow For Heating Boiler General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemHeat Exchanger Pressure Drop Chart Circulator Pump SpecificationsWater Connections Heating Boilers Only Circulator Pump RequirementsPrimary/Secondary Boiler Piping Three Way Valves Boiler Flow RatesPrimary / Secondary Piping 4Primary / Secondary Piping of a Single BoilerNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Terminal Strip Wiring Boiler Operating Temperature ControlPower Venter Connection to Terminal Strip Electrical connectionsPump Wiring for a Heating Boiler Temperature AdjustmentOperating Temperature Control Locating Temperature Control Temperature Control SettingsMaximum SET Point Determination Maximum Set Point DeterminationTemperature Control Sensors Inlet Water Temperature SensorMulti-Purpose Temperature Sensor Outdoor Air Temperature SensorInstallation of a Remote Sensor Boiler Application Outdoor Air Reset OptionInstallation of a Tank Sensor Water Heater Application Additional Temperature Controls Blocked Vent and Flame Roll-Out / Flame Interlock Switch Manual Reset High Water Temperature Limit ControlStart-up Pre-start ChecklistInitial Start-up Lighting Instructions 1Gas Valve 90,000 270,000 Btu/hr ModelsSafety Shutoff Test For Standing Pilot Ignition System To Turn OFF GAS to ApplianceOperating Instructions Safety Shutoff Test for Spark Ignition Pilot System Intermittent Pilot Spark Ignition System F9/M9Freeze Protection To Turn Off Gas to ApplianceWater Treatment Freeze Protection for a Heating Boiler System if requiredRequired Temperature Rise Required Temperature RiseDomestic water heaters Domestic Water Heaters 90,000 500,000 Btu/hr ModelsSoftened Water Systems Water ChemistryPump Operation 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Remote Sensor Installation Thermostat SettingsMinimum Pump Performance Heat Exchanger5Danger Warning Water Flow Switch if equipped Pressure Only Relief ValveThermal Expansion Cathodic ProtectionMaintenance and annual startup Service technicianOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveCheck All Wiring Check Control SettingsCombustion Air Adjustment Perform Start-up and ChecksHeat Exchanger / Burner Access Inspect and Clean BurnerInspection and Cleaning Procedure Pilot Flame Adjustment Procedure Clear AreaInspection of Heat Exchanger Waterways Water Circulating PumpReview with owner Gas Train and ControlsTroubleshooting Pilot or replace Diagrams Schematic Diagram F1 UnitWiring Diagram F1 Unit 90,000 270,000 Btu/hr ModelsWiring Diagram F9 Unit Schematic Diagram F9 Unit315,000 399,999 Btu/hr Models Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10