Lochinvar 500 service manual Lighting Instructions, 1Gas Valve 90,000 270,000 Btu/hr Models

Page 41

6Start-up(continued)

Lighting Instructions

1.STOP! Read the safety information (page 40).

2.Remove the control panel door.

3.Set the thermostat to the lowest setting (OFF).

4.Turn off all electrical power to the appliance.

5.Turn the gas control knob on the gas valve clockwise to the “OFF” position.

Figure 6-1_Gas Valve 90,000 - 270,000 Btu/hr Models

F-1 GAS VALVE

90,000 -270,000 BTU MODELS

TOP

Installation & Service Manual

Figure 6-2_Pilot Location

Pilot Location

Main Burner

TOP OF FLAME SPREADER TO BE

FLUSH WITH TOP OF BURNER

9.Turn the control knob on the gas valve counterclock- wise to the “PILOT” position.

Figure 6-3_Lighting Wand

FLOW

SIDEOUTLET

6.Wait five (5) minutes to clear out any gas, then smell for gas, including near the floor. If you smell gas, STOP! Follow the steps in the“What To Do If You Smell Gas” section in the safety information on page 40. If you do not smell gas go on to the next step.

7.Remove the lower panel door to gain access to the pilot.

8.Find the pilot - Follow the metal tube from the gas valve to the pilot. The pilot is located on the right side of the burner approximately centered in the burner tray.

NOTICE

USE A FIELD SUPPLIED LIGHTER OR THE FACTORY SUPPLIED LIGHTING WAND TO LIGHT THE STANDING PILOT

The information package shipped with the appliance contains a wire lighting wand. The loop end of the wand will hold a match. The wand extends your reach to the pilot and makes lighting the pilot easier (see FIG. 6-3).

41

Image 41
Contents Models 90,000 500,000 Btu/hr Contents Checking equipment Please read before proceedingCodes Copper-fin =B=R Rating RatingsCopper-fin Specifications Gas connection pipe Copper-fin How it worksModels CWN270 Front View Model CWN399 Front View 422 Location of unit Determine unit location3Combustion Air Direct from Outside Determine boiler location6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesVent Materials Masonry Chimney InstallationSidewall Venting Number7CB with Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas Supply Gas Pressure Test Gas connectionsGas Connection Manifold PressureGas Piping Install Piping to ControlClockwise to raise regulator gas pressure, counterclockwise Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedHydronic piping Low Water Cutoff if equipped Typical Heating Boiler InstallationsMinimum Required Flow For Heating Boiler General Plumbing RulesPiping of the Boiler System System Temperature Rise ChartCirculator Pump Specifications Heat Exchanger Pressure Drop ChartWater Connections Heating Boilers Only Circulator Pump RequirementsPrimary/Secondary Boiler Piping Boiler Flow Rates Three Way Valves4Primary / Secondary Piping of a Single Boiler Primary / Secondary PipingNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Boiler Operating Temperature Control Terminal Strip WiringPower Venter Connection to Terminal Strip Electrical connectionsOperating Temperature Control Temperature AdjustmentPump Wiring for a Heating Boiler Temperature Control Settings Locating Temperature ControlMaximum SET Point Determination Maximum Set Point DeterminationInlet Water Temperature Sensor Temperature Control SensorsMulti-Purpose Temperature Sensor Outdoor Air Temperature SensorInstallation of a Tank Sensor Water Heater Application Outdoor Air Reset OptionInstallation of a Remote Sensor Boiler Application Additional Temperature Controls Manual Reset High Water Temperature Limit Control Blocked Vent and Flame Roll-Out / Flame Interlock SwitchInitial Start-up Pre-start ChecklistStart-up 1Gas Valve 90,000 270,000 Btu/hr Models Lighting InstructionsTo Turn OFF GAS to Appliance Safety Shutoff Test For Standing Pilot Ignition SystemOperating Instructions Intermittent Pilot Spark Ignition System F9/M9 Safety Shutoff Test for Spark Ignition Pilot SystemFreeze Protection To Turn Off Gas to ApplianceFreeze Protection for a Heating Boiler System if required Water TreatmentRequired Temperature Rise Required Temperature RiseDomestic water heaters Domestic Water Heaters 90,000 500,000 Btu/hr ModelsPump Operation Water ChemistrySoftened Water Systems 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Thermostat Settings Remote Sensor InstallationMinimum Pump Performance Heat Exchanger5Danger Warning Pressure Only Relief Valve Water Flow Switch if equippedThermal Expansion Cathodic ProtectionService technician Maintenance and annual startupOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Relief Valve Check Expansion TankCheck Control Settings Check All WiringCombustion Air Adjustment Perform Start-up and ChecksInspection and Cleaning Procedure Inspect and Clean BurnerHeat Exchanger / Burner Access Clear Area Pilot Flame Adjustment ProcedureInspection of Heat Exchanger Waterways Water Circulating PumpGas Train and Controls Review with ownerTroubleshooting Pilot or replace Schematic Diagram F1 Unit DiagramsWiring Diagram F1 Unit 90,000 270,000 Btu/hr Models315,000 399,999 Btu/hr Models Schematic Diagram F9 UnitWiring Diagram F9 Unit Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10