4Hydronic piping

9.Inspect the liquid level in the expansion tank. The system must be full and under normal operating pressure to ensure proper water level in the expansion tank. Ensure that diaphragm type expansion tanks are properly charged and not water logged.

10.Start the boiler according to the Section 6 - “Start-Up Instructions” in this manual. Operate the system, including the pump, boiler and radiation units, for one hour.

11.Recheck the water level in the expansion tank. If it exceeds half the tank volume, open the tank to reduce the water level. Recheck pressure charge on diaphragm type tanks.

12.Shut down the entire system and vent all radiation units and high points in the system.

13.Close the water makeup valve and check the strainer and pressure reducing valve for sediment or debris. Reopen the water makeup valve.

14.Verify system pressure with the boiler pressure gauge before beginning regular operation.

15.Within three days of start-up, recheck and bleed all air vents and the expansion tank using these instructions.

Installation & Service Manual

Piping of the Boiler System

The drawings in this section (see FIG’s 4-4 through 4-6) show typical heating boiler piping installations. Before beginning the installation, consult local codes for specific plumbing requirements. The installation should provide unions and valves at the inlet and outlet of the boiler so it can be isolated for service. The boiler circulating pump, air separator, expansion tank and other components required for proper installation must be purchased locally. An air separation device must be supplied in the installation piping to eliminate trapped air in the system. Locate a system air vent at the highest point in the system. The system must also have a properly sized expansion tank installed. Typically, an air charged diaphragm-type expansion tank is used. The expansion tank must be installed close to the boiler and on the suction side of the system pump to ensure proper operation.

￿ CAUTION

This boiler system should not be operated at

 

less than 12 PSIG.

TABLE - 4B

SYSTEM TEMPERATURE RISE CHART

Based on Boiler Output in Btu/hr

 

Btu/hr

 

20°F ￿T

30°F ￿T

40°F ￿T

 

 

 

 

 

 

 

 

 

 

 

 

 

Input

 

Output

GPM

Ft/hd

GPM

Ft/hd

GPM

Ft/hd

 

 

 

 

 

 

 

 

 

 

 

 

 

315,000

 

258,300

26.0

4.1

17.3

2.2

13.0

1.3

 

 

 

 

 

 

 

 

 

 

 

 

 

360,000

 

295,200

29.7

5.4

19.8

2.5

14.9

1.5

 

 

 

 

 

 

 

 

 

 

 

 

 

399,999

 

327,180

--

--

22.0

3.6

16.5

2.0

 

 

 

 

 

 

 

 

 

 

 

 

 

500,000

 

410,000

--

--

27.6

6.6

20.7

3.5

 

 

 

 

 

 

 

 

 

 

 

 

26

Image 26
Contents Models 90,000 500,000 Btu/hr Contents Please read before proceeding Checking equipmentCodes Ratings Copper-fin =B=R RatingCopper-fin Specifications Copper-fin How it works Gas connection pipeModels CWN270 Front View Model CWN399 Front View 422 Determine unit location Location of unitDetermine boiler location 3Combustion Air Direct from Outside6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallSidewall Venting Masonry Chimney InstallationVent Materials NumberAutomatic Vent Damper 7CB with Vent Damper and Vent Damper Terminal BlockGas Connection Gas connectionsGas Supply Gas Pressure Test Manifold PressureInstall Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure Clockwise to raise regulator gas pressure, counterclockwiseChecking Gas Supply Pressure 4Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedHydronic piping Minimum Required Flow For Heating Boiler Typical Heating Boiler InstallationsLow Water Cutoff if equipped General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemWater Connections Heating Boilers Only Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Circulator Pump RequirementsPrimary/Secondary Boiler Piping Three Way Valves Boiler Flow RatesPrimary / Secondary Piping 4Primary / Secondary Piping of a Single BoilerNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Power Venter Connection to Terminal Strip Terminal Strip WiringBoiler Operating Temperature Control Electrical connectionsOperating Temperature Control Temperature AdjustmentPump Wiring for a Heating Boiler Maximum SET Point Determination Locating Temperature ControlTemperature Control Settings Maximum Set Point DeterminationMulti-Purpose Temperature Sensor Temperature Control SensorsInlet Water Temperature Sensor Outdoor Air Temperature SensorInstallation of a Tank Sensor Water Heater Application Outdoor Air Reset OptionInstallation of a Remote Sensor Boiler Application Additional Temperature Controls Blocked Vent and Flame Roll-Out / Flame Interlock Switch Manual Reset High Water Temperature Limit ControlInitial Start-up Pre-start ChecklistStart-up Lighting Instructions 1Gas Valve 90,000 270,000 Btu/hr ModelsSafety Shutoff Test For Standing Pilot Ignition System To Turn OFF GAS to ApplianceOperating Instructions Freeze Protection Safety Shutoff Test for Spark Ignition Pilot SystemIntermittent Pilot Spark Ignition System F9/M9 To Turn Off Gas to ApplianceWater Treatment Freeze Protection for a Heating Boiler System if requiredDomestic water heaters Required Temperature RiseRequired Temperature Rise Domestic Water Heaters 90,000 500,000 Btu/hr ModelsPump Operation Water ChemistrySoftened Water Systems 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Minimum Pump Performance Remote Sensor InstallationThermostat Settings Heat Exchanger5Danger Warning Thermal Expansion Water Flow Switch if equippedPressure Only Relief Valve Cathodic ProtectionOwner maintenance Maintenance and annual startupService technician See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveCombustion Air Adjustment Check All WiringCheck Control Settings Perform Start-up and ChecksInspection and Cleaning Procedure Inspect and Clean BurnerHeat Exchanger / Burner Access Inspection of Heat Exchanger Waterways Pilot Flame Adjustment ProcedureClear Area Water Circulating PumpReview with owner Gas Train and ControlsTroubleshooting Pilot or replace Wiring Diagram F1 Unit DiagramsSchematic Diagram F1 Unit 90,000 270,000 Btu/hr Models315,000 399,999 Btu/hr Models Schematic Diagram F9 UnitWiring Diagram F9 Unit Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10