Lochinvar 500, 90 service manual 1Single water heatersingle tank

Page 48

7Domestic water heaters

Figure 7-1_Single water heater_single tank

 

BALL VALVE

 

(TYPICAL)

COLD WATER

FLOW CHECK

VALVE (TYPICAL)

SUPPLY

 

MIXING VALVE

 

THERMOMETER

EXPANSION

TANK

 

HOT WATER

 

SUPPLY

 

UNION

 

(TYPICAL)

 

TEMPERATURE

 

&PRESSURE RELIEF VALVE (TYPICAL)

STORAGE

 

TANK

DRAIN

Installation & Service Manual

BUILDING

RETURN

FLOW

SWITCH

WATER

HEATER

WATER HEATER

CIRCULATOR

Y-STRAINER [RECOMMENDED]

NOTICE

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

48

Image 48
Contents Models 90,000 500,000 Btu/hr Contents Please read before proceeding Checking equipmentCodes Ratings Copper-fin =B=R RatingCopper-fin Specifications Copper-fin How it works Gas connection pipeModels CWN270 Front View Model CWN399 Front View 422 Determine unit location Location of unitDetermine boiler location 3Combustion Air Direct from Outside6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Vertical Vent Termination Clearances Less from Ridge From Parapet WallMasonry Chimney Installation Vent MaterialsSidewall Venting NumberAutomatic Vent Damper 7CB with Vent Damper and Vent Damper Terminal BlockGas connections Gas Supply Gas Pressure TestGas Connection Manifold PressureInstall Piping to Control Gas PipingGas Manifold Pressure Adjustment Procedure Clockwise to raise regulator gas pressure, counterclockwiseChecking Gas Supply Pressure 4Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Hydronic pipingRelief Valve Typical Heating Boiler Installations Low Water Cutoff if equippedMinimum Required Flow For Heating Boiler General Plumbing RulesSystem Temperature Rise Chart Piping of the Boiler SystemHeat Exchanger Pressure Drop Chart Circulator Pump SpecificationsWater Connections Heating Boilers Only Circulator Pump RequirementsPrimary/Secondary Boiler Piping Three Way Valves Boiler Flow RatesPrimary / Secondary Piping 4Primary / Secondary Piping of a Single BoilerNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Terminal Strip Wiring Boiler Operating Temperature ControlPower Venter Connection to Terminal Strip Electrical connectionsTemperature Adjustment Pump Wiring for a Heating BoilerOperating Temperature Control Locating Temperature Control Temperature Control SettingsMaximum SET Point Determination Maximum Set Point DeterminationTemperature Control Sensors Inlet Water Temperature SensorMulti-Purpose Temperature Sensor Outdoor Air Temperature SensorOutdoor Air Reset Option Installation of a Remote Sensor Boiler ApplicationInstallation of a Tank Sensor Water Heater Application Additional Temperature Controls Blocked Vent and Flame Roll-Out / Flame Interlock Switch Manual Reset High Water Temperature Limit ControlPre-start Checklist Start-upInitial Start-up Lighting Instructions 1Gas Valve 90,000 270,000 Btu/hr ModelsSafety Shutoff Test For Standing Pilot Ignition System To Turn OFF GAS to ApplianceOperating Instructions Safety Shutoff Test for Spark Ignition Pilot System Intermittent Pilot Spark Ignition System F9/M9Freeze Protection To Turn Off Gas to ApplianceWater Treatment Freeze Protection for a Heating Boiler System if requiredRequired Temperature Rise Required Temperature RiseDomestic water heaters Domestic Water Heaters 90,000 500,000 Btu/hr ModelsWater Chemistry Softened Water SystemsPump Operation 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Remote Sensor Installation Thermostat SettingsMinimum Pump Performance Heat Exchanger5Danger Warning Water Flow Switch if equipped Pressure Only Relief ValveThermal Expansion Cathodic ProtectionMaintenance and annual startup Service technicianOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Expansion Tank Check Relief ValveCheck All Wiring Check Control SettingsCombustion Air Adjustment Perform Start-up and ChecksInspect and Clean Burner Heat Exchanger / Burner AccessInspection and Cleaning Procedure Pilot Flame Adjustment Procedure Clear AreaInspection of Heat Exchanger Waterways Water Circulating PumpReview with owner Gas Train and ControlsTroubleshooting Pilot or replace Diagrams Schematic Diagram F1 UnitWiring Diagram F1 Unit 90,000 270,000 Btu/hr ModelsSchematic Diagram F9 Unit Wiring Diagram F9 Unit315,000 399,999 Btu/hr Models Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10