Lochinvar service manual Models 90,000 500,000 Btu/hr

Page 1

CFA-I-S Rev A

Installation & Service Manual

Models: 90,000 - 500,000 Btu/hr

￿WARNING:

This manual supplies information for the installation, operation, and servicing of the appliance. It is strongly recommended that this manual be reviewed completely before proceeding with an installation. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.

Save this manual for future reference.

Image 1
Contents Models 90,000 500,000 Btu/hr Contents Checking equipment Please read before proceedingCodes Copper-fin =B=R Rating RatingsCopper-fin Specifications Gas connection pipe Copper-fin How it worksModels CWN270 Front View Model CWN399 Front View 422 Location of unit Determine unit location3Combustion Air Direct from Outside Determine boiler location6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Conventional Negative Draft Venting System VentingVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesVent Materials Masonry Chimney InstallationSidewall Venting Number7CB with Vent Damper and Vent Damper Terminal Block Automatic Vent DamperGas Supply Gas Pressure Test Gas connectionsGas Connection Manifold PressureGas Piping Install Piping to ControlClockwise to raise regulator gas pressure, counterclockwise Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureVenting of Combination Gas Valves Combination Gas ValvesTwo Stage Burner Control System Hydronic piping Water Flow Switch if equippedRelief Valve Low Water Cutoff if equipped Typical Heating Boiler InstallationsMinimum Required Flow For Heating Boiler General Plumbing RulesPiping of the Boiler System System Temperature Rise ChartCirculator Pump Specifications Heat Exchanger Pressure Drop ChartWater Connections Heating Boilers Only Circulator Pump RequirementsPrimary/Secondary Boiler Piping Boiler Flow Rates Three Way Valves4Primary / Secondary Piping of a Single Boiler Primary / Secondary PipingNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Boiler Operating Temperature Control Terminal Strip WiringPower Venter Connection to Terminal Strip Electrical connectionsPump Wiring for a Heating Boiler Temperature AdjustmentOperating Temperature Control Temperature Control Settings Locating Temperature ControlMaximum SET Point Determination Maximum Set Point DeterminationInlet Water Temperature Sensor Temperature Control SensorsMulti-Purpose Temperature Sensor Outdoor Air Temperature SensorInstallation of a Remote Sensor Boiler Application Outdoor Air Reset OptionInstallation of a Tank Sensor Water Heater Application Additional Temperature Controls Manual Reset High Water Temperature Limit Control Blocked Vent and Flame Roll-Out / Flame Interlock SwitchStart-up Pre-start ChecklistInitial Start-up 1Gas Valve 90,000 270,000 Btu/hr Models Lighting InstructionsTo Turn OFF GAS to Appliance Safety Shutoff Test For Standing Pilot Ignition SystemOperating Instructions Intermittent Pilot Spark Ignition System F9/M9 Safety Shutoff Test for Spark Ignition Pilot SystemFreeze Protection To Turn Off Gas to ApplianceFreeze Protection for a Heating Boiler System if required Water TreatmentRequired Temperature Rise Required Temperature RiseDomestic water heaters Domestic Water Heaters 90,000 500,000 Btu/hr ModelsSoftened Water Systems Water ChemistryPump Operation 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Thermostat Settings Remote Sensor InstallationMinimum Pump Performance Heat Exchanger5Danger Warning Pressure Only Relief Valve Water Flow Switch if equippedThermal Expansion Cathodic ProtectionService technician Maintenance and annual startupOwner maintenance See the User’s Information Manual for instructionsMaintenance Check Relief Valve Check Expansion TankCheck Control Settings Check All WiringCombustion Air Adjustment Perform Start-up and ChecksHeat Exchanger / Burner Access Inspect and Clean BurnerInspection and Cleaning Procedure Clear Area Pilot Flame Adjustment ProcedureInspection of Heat Exchanger Waterways Water Circulating PumpGas Train and Controls Review with ownerTroubleshooting Pilot or replace Schematic Diagram F1 Unit DiagramsWiring Diagram F1 Unit 90,000 270,000 Btu/hr ModelsWiring Diagram F9 Unit Schematic Diagram F9 Unit315,000 399,999 Btu/hr Models Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10