Lochinvar 90, 500 service manual Determine boiler location, 3Combustion Air Direct from Outside

Page 11

Installation & Service Manual

1Determine boiler location

Combustion and ventilation air requirements for conventionally vented appliances

Provisions for combustion and ventilation air must be in accordance with the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local building codes.

The room where the appliance is installed MUST be provided with properly sized openings to assure adequate combustion air and proper ventilation when the appliance is installed with conventional venting.

Figure 1-3_Combustion Air Direct from Outside

1.If air is taken directly from outside the building with no duct, provide two permanent openings (see FIG. 1-3):

(a)Combustion air opening, with a minimum free area of one square inch per 4000 Btu/hr input (5.5 cm2 per kW). This opening must be located within 12" (30 cm) of the floor.

(b)Ventilation air opening, with a minimum free area of one square inch per 4000 Btu/hr input (5.5 cm2 per kW). This opening must be located within 12" (30 cm) of the ceiling.

Figure 1-4_Combustion Air Through Ducts

2.If combustion and ventilation air is taken from the outdoors using a duct to deliver the air to the room where the appliance is installed, each of the two openings should be sized based on a minimum free area of one square inch per 2000 Btu/hr (11cm2 per kW) (see FIG. 1-4).

Figure 1-5_Combustion Air from Interior Space

3.If air is taken from another interior space that is adequately ventilated, each of the two openings specified above should have a net free area of one square inch for each 1000 Btu/hr (22cm2 per kW) of input, but not less than 100 square inches (645cm2) (see FIG. 1-5).

11

Image 11
Contents Models 90,000 500,000 Btu/hr Contents Checking equipment Please read before proceedingCodes Copper-fin =B=R Rating RatingsCopper-fin Specifications Gas connection pipe Copper-fin How it worksModels CWN270 Front View Model CWN399 Front View 422 Location of unit Determine unit location3Combustion Air Direct from Outside Determine boiler location6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Vent Pipe Sizes VentingConventional Negative Draft Venting System Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesNumber Masonry Chimney InstallationVent Materials Sidewall Venting7CB with Vent Damper and Vent Damper Terminal Block Automatic Vent DamperManifold Pressure Gas connectionsGas Supply Gas Pressure Test Gas ConnectionGas Piping Install Piping to ControlClockwise to raise regulator gas pressure, counterclockwise Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureTwo Stage Burner Control System Combination Gas ValvesVenting of Combination Gas Valves Relief Valve Water Flow Switch if equippedHydronic piping General Plumbing Rules Typical Heating Boiler InstallationsLow Water Cutoff if equipped Minimum Required Flow For Heating BoilerPiping of the Boiler System System Temperature Rise ChartCirculator Pump Requirements Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Water Connections Heating Boilers OnlyPrimary/Secondary Boiler Piping Boiler Flow Rates Three Way Valves4Primary / Secondary Piping of a Single Boiler Primary / Secondary PipingNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Electrical connections Terminal Strip WiringBoiler Operating Temperature Control Power Venter Connection to Terminal StripOperating Temperature Control Temperature AdjustmentPump Wiring for a Heating Boiler Maximum Set Point Determination Locating Temperature ControlTemperature Control Settings Maximum SET Point DeterminationOutdoor Air Temperature Sensor Temperature Control SensorsInlet Water Temperature Sensor Multi-Purpose Temperature SensorInstallation of a Tank Sensor Water Heater Application Outdoor Air Reset OptionInstallation of a Remote Sensor Boiler Application Additional Temperature Controls Manual Reset High Water Temperature Limit Control Blocked Vent and Flame Roll-Out / Flame Interlock SwitchInitial Start-up Pre-start ChecklistStart-up 1Gas Valve 90,000 270,000 Btu/hr Models Lighting InstructionsTo Turn OFF GAS to Appliance Safety Shutoff Test For Standing Pilot Ignition SystemOperating Instructions To Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemIntermittent Pilot Spark Ignition System F9/M9 Freeze ProtectionFreeze Protection for a Heating Boiler System if required Water TreatmentDomestic Water Heaters 90,000 500,000 Btu/hr Models Required Temperature RiseRequired Temperature Rise Domestic water heatersPump Operation Water ChemistrySoftened Water Systems 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Heat Exchanger Remote Sensor InstallationThermostat Settings Minimum Pump Performance5Danger Warning Cathodic Protection Water Flow Switch if equippedPressure Only Relief Valve Thermal ExpansionSee the User’s Information Manual for instructions Maintenance and annual startupService technician Owner maintenanceMaintenance Check Relief Valve Check Expansion TankPerform Start-up and Checks Check All WiringCheck Control Settings Combustion Air AdjustmentInspection and Cleaning Procedure Inspect and Clean BurnerHeat Exchanger / Burner Access Water Circulating Pump Pilot Flame Adjustment ProcedureClear Area Inspection of Heat Exchanger WaterwaysGas Train and Controls Review with ownerTroubleshooting Pilot or replace 90,000 270,000 Btu/hr Models DiagramsSchematic Diagram F1 Unit Wiring Diagram F1 Unit315,000 399,999 Btu/hr Models Schematic Diagram F9 UnitWiring Diagram F9 Unit Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10