Lochinvar 500 service manual Diagrams, Schematic Diagram F1 Unit, 90,000 270,000 Btu/hr Models

Page 63

10 Diagrams

Schematic Diagram - F1 Unit

90,000 - 270,000 Btu/hr Models

Installation & Service Manual

Wiring Diagram - F1 Unit

90,000 - 270,000 Btu/hr Models

63

Image 63
Contents Models 90,000 500,000 Btu/hr Contents Checking equipment Please read before proceedingCodes Copper-fin =B=R Rating RatingsCopper-fin Specifications Gas connection pipe Copper-fin How it worksModels CWN270 Front View Model CWN399 Front View 422 Location of unit Determine unit location3Combustion Air Direct from Outside Determine boiler location6Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Venting Conventional Negative Draft Venting SystemVent Pipe Sizes Venting Less from Ridge From Parapet Wall Vertical Vent Termination ClearancesNumber Masonry Chimney InstallationVent Materials Sidewall Venting7CB with Vent Damper and Vent Damper Terminal Block Automatic Vent DamperManifold Pressure Gas connectionsGas Supply Gas Pressure Test Gas ConnectionGas Piping Install Piping to ControlClockwise to raise regulator gas pressure, counterclockwise Gas Manifold Pressure Adjustment Procedure4Gas Supply Pressure Checking Gas Supply PressureCombination Gas Valves Venting of Combination Gas ValvesTwo Stage Burner Control System Water Flow Switch if equipped Hydronic pipingRelief Valve General Plumbing Rules Typical Heating Boiler InstallationsLow Water Cutoff if equipped Minimum Required Flow For Heating BoilerPiping of the Boiler System System Temperature Rise ChartCirculator Pump Requirements Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Water Connections Heating Boilers OnlyPrimary/Secondary Boiler Piping Boiler Flow Rates Three Way Valves4Primary / Secondary Piping of a Single Boiler Primary / Secondary PipingNot to Exceed 4 Pipe DIA or MAX. of 12 Apart 8Multiple Boilers Zoned with Circulators Electrical connections Terminal Strip WiringBoiler Operating Temperature Control Power Venter Connection to Terminal StripTemperature Adjustment Pump Wiring for a Heating BoilerOperating Temperature Control Maximum Set Point Determination Locating Temperature ControlTemperature Control Settings Maximum SET Point DeterminationOutdoor Air Temperature Sensor Temperature Control SensorsInlet Water Temperature Sensor Multi-Purpose Temperature SensorOutdoor Air Reset Option Installation of a Remote Sensor Boiler ApplicationInstallation of a Tank Sensor Water Heater Application Additional Temperature Controls Manual Reset High Water Temperature Limit Control Blocked Vent and Flame Roll-Out / Flame Interlock SwitchPre-start Checklist Start-upInitial Start-up 1Gas Valve 90,000 270,000 Btu/hr Models Lighting InstructionsTo Turn OFF GAS to Appliance Safety Shutoff Test For Standing Pilot Ignition SystemOperating Instructions To Turn Off Gas to Appliance Safety Shutoff Test for Spark Ignition Pilot SystemIntermittent Pilot Spark Ignition System F9/M9 Freeze ProtectionFreeze Protection for a Heating Boiler System if required Water TreatmentDomestic Water Heaters 90,000 500,000 Btu/hr Models Required Temperature RiseRequired Temperature Rise Domestic water heatersWater Chemistry Softened Water SystemsPump Operation 1Single water heatersingle tank 2Single water heatermultiple tank 3Multiple water heatersingle tank Heat Exchanger Remote Sensor InstallationThermostat Settings Minimum Pump Performance5Danger Warning Cathodic Protection Water Flow Switch if equippedPressure Only Relief Valve Thermal ExpansionSee the User’s Information Manual for instructions Maintenance and annual startupService technician Owner maintenanceMaintenance Check Relief Valve Check Expansion TankPerform Start-up and Checks Check All WiringCheck Control Settings Combustion Air AdjustmentInspect and Clean Burner Heat Exchanger / Burner AccessInspection and Cleaning Procedure Water Circulating Pump Pilot Flame Adjustment ProcedureClear Area Inspection of Heat Exchanger WaterwaysGas Train and Controls Review with ownerTroubleshooting Pilot or replace 90,000 270,000 Btu/hr Models DiagramsSchematic Diagram F1 Unit Wiring Diagram F1 UnitSchematic Diagram F9 Unit Wiring Diagram F9 Unit315,000 399,999 Btu/hr Models Diagrams Diagrams Page Revision a ECO #C06290 initial release CFA-I-S Rev a 09/10