Raypak 0090B 0135B installation instructions Replacement Parts List, Raypak, Inc

Page 34

j)Reverse above procedure to re-install.

9.Fast Response Temperature Sensor Module Replacement

a)Shut-off electrical power to the boiler.

b)Remove control cover screws and open control compartment.

c)Disconnect wiring connections to the board.

d)Carefully pull out the control board from the nylon pin supports.

e)Reverse above procedure to re-install.

10.Fast Response Temperature Sensor Probe Replacement

a)Shut off electrical power to the boiler.

b)Shut off water supply to the boiler and open drain valve to remove water to the sensor probe level.

c)Remove control cover screws and open control compartment.

d)Disconnect wire leads from control board.

e)Remove upper access panel.

f)Remove sensor probe from in/out header.

g)Reverse above procedure to re-install.

11.Circulator Replacement

a)Shut off electrical power to the boiler.

b)Shut off water supply and open drain valve to remove water in the piping at the pump level.

CAUTION: To avoid damage to electrical components keep water from getting into the control compartments and gas valve.

c)Disconnect wiring and conduit connections to the pump.

d)Disconnect the by-pass tube connections to the inlet flange.

e)Remove the nuts and bolts at the inlet and outlet flanges. Remove old gaskets.

f)Remove the pump.

g)Reverse the above procedure to re-install. Use new gaskets and make sure they are seated properly when tightening the nuts

and bolts.

12.2-Staged Controller (Models 90, 135 & 180)

a)Shut off electrical power to the boiler.

b)Remove control cover screws and open con- trol compartment.

c)The control is factory set at 160°F. To reset to another setting, use a small screw driver

and turn dial clockwise to lower the

temperature or counter-clockwise

to

raise the setting.

 

d)To replace the staged controller, disconnect the wiring connections.

e)Remove screws (2) holding the staged controller.

f)Remove upper access panel.

g)Remove the wedge or retaining clip holding the sensing bulb in the control well in the in/ out header.

h)Pull out the sensing bulb carefully from the control well.

i)Remove the staged control with capillary from unit.

j)Reverse above procedure to re-install.

6. REPLACEMENT PARTS LIST

NOTE: To supply the correct part it is important that you state the model number, serial number and type of gas when applicable.

Any part returned for replacement under standard company warranties must be properly tagged with RAYPAK return parts tag, completely filled in with the heater serial number, model number etc., and shipped to the Company freight prepaid.

If determined defective by the Company and within warranty, the part will be returned in kind or equal substitution, freight collect. Credit will not be issued.

RAYPAK, INC.

31111 Agoura Road

Westlake Village, CA 91361-4699

34

Image 34
Contents Operating Installation Instructions For Your SafetyContents Specifications and Dimensions General SpecificationsReceiving Equipment Mounting Base Installation ProceduresCode Requirements Clearance RequirementsModel Sq. In. of Free Area 0030, 0042 100 Venting ConnectionsCommon Vents Fig.#Vent Damper Installation LocationD80D General Wiring Diagram Installing the Vent Damper in Horizontal & Vertical VentsMounting Vent Damper Flair DamperGAS Supply Connections GAS PRESSURE-SPECIFICATIONSWater Connections & System Piping Typical Piping Single Zone PipingZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Circulators Multiple Zones with Zone ValvesElectrical Wiring Fig.#Wiring Diagram Standing Pilot 24 V 2 Stage Fig. # 2223eWiring Diagramintermittent Ignition Device IID Models 30, 42 Wiring Diagram Intermittent Ignition Device IID Fig. #2358Wiring Diagram Single Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut Off Device Control BOX Component Locations Models 135 Servicing ProceduresGeneral Location of Controls Sequence of Operation Intermittent Ignition Device IIDSTART-UP Procedures Filling the SystemLighting the Boiler What to do if YOU Smell GASHoneywell Pilot Robertshaw Pilot For Automatic Ignition ModelsSystem Shut Down Procedure To Turn OFF GAS to BoilerFor Automatic Ignition Systems Flame Failure Inspection Procedures BurnersSafe Shutdown Tests Limit Action Main Burner FlameMain Burner and Orifice Removal Raypak Tube Cleaning KITBurner Drawer Removal Repair SectionHeat Exchanger RE-ASSEMBLY Combustion Chamber RemovalTrouble Shooting Guide Important NoticePiping ADJUSTMENTS/REPLACEMENTS of Components Replacement Parts List RAYPAK, INCBypass valve supplied on sizes H-0135 and H-0180 only Page Venting