5. TROUBLE SHOOTING GUIDE

IMPORTANT NOTICE

These instructions are primarily intended for the use of qualified personnel specifically trained and experienced in the installation of this type of heating equipment and related system components. Installation and service personnel may be required by some states to be licensed. Persons not qualified shall not attempt to install this equipment nor attempt repairs according to these instructions.

PROBLEM(S)

CAUSE(S)

SOLUTION(S)

1)When room thermostat is turned on,

1)No power to the boiler.

1)Check circuit breakers, disconnect

boiler does not operate.

 

switch. Make sure power is on.

 

2)Defective room thermostat or discon-

2)Check continuity on thermostat and

 

wiring circuit. Replace thermostat, or

 

nected wire in thermostat circuit.

 

repair wiring connections.

 

 

 

3)Defective transformer.

3) Check secondary voltage. If no 24V,

 

replace transformer.

 

 

 

4)Defective pump relay.

4) Check relay coil or contacts. Replace

 

as required.

 

 

 

5)Defective pump

5) Replace pump.

 

 

 

 

 

2)When room thermostat is calling for

1)For Standing pilot models pilot burner

1)Light pilot burner. (Follow lighting

heat, pump is on, but burners will not

not lighted.

instructions on rating plate).

turn on.

2)If pilot burner will not stay lighted,

2)Check thermocouple MV generation.

 

thermocouple or gas valve may be

If less than 25MV (open circuit), re

 

place thermocouple. If between 25-

 

defective.

 

35 MV, replace gas valve.

 

 

 

3)Gas knob in "Pilot" position.

3)Turn knob to "ON" position.

 

4)Turn gas knob to "ON". If ignition

 

4)For automatic ignition models,

 

module locks out, reset by interrupt-

 

gas valve knob is in "off" position.

 

ing power to boiler.

 

 

 

5)Vent switch is open.

5) Check for blockage of venting system

 

or disconnected vent piping. After

 

 

 

 

problem is corrected push button to

 

 

reset, or replace single use type vent

 

 

switch.

 

6)Roll-out switch is open.

6)Check for blockage of flue or sooted

 

heat exchanger. After problem is

 

 

 

 

corrected push button to reset or re-

 

 

place single use type roll-out switch.

 

7)High limit is open.

7)Setting may be too low. Check water

 

flow and adjust setting to obtain 20-

 

 

 

 

30°F temperature rise.

 

8) Fast Response Temperature

8)Red LED on circuit board will be ON

 

to indicate a loose sensor connection

 

Sensor probe is defective.

 

or a shorted sensor. Check terminal

 

 

 

 

connectors or replace sensor as re-

 

 

quired.

 

 

NOTE: Red LED will also be ON if

 

 

sensor temperature exceeds 300°F or

 

 

drops below - 20°F. It will turn OFF

 

 

when sensor temperature returns to the

 

 

proper range. Yellow LED will be ON, if

 

 

temperature exceeds 240°F. It will turn

 

 

off when sensor temperature falls below

 

 

180°F. When either Red or Yellow LED

 

 

is ON, boiler will be shut down.

 

9) Fast Response Temperature

9)Check voltage across output and

 

common terminals. If no 24V is pres-

 

sensor board is defective.

 

ent, replace board.

 

 

31

Image 31
Contents For Your Safety Operating Installation InstructionsContents Specifications and Dimensions General SpecificationsReceiving Equipment Clearance Requirements Installation ProceduresCode Requirements Mounting BaseVenting Connections Model Sq. In. of Free Area 0030, 0042 100Fig.# Common VentsLocation Vent Damper InstallationD80D General Wiring Diagram Installing the Vent Damper in Horizontal & Vertical VentsMounting Flair Damper Vent DamperGAS Supply Connections GAS PRESSURE-SPECIFICATIONSWater Connections & System Piping Single Zone Piping Typical PipingZone Heating with Indirect Domestic HOT Water Supply Multiple Zones with Zone Valves Multiple Zones with CirculatorsFig.# Electrical WiringFig. # 2223e Wiring Diagram Standing Pilot 24 V 2 StageWiring Diagramintermittent Ignition Device IID Models 30, 42 Fig. #2358 Wiring Diagram Intermittent Ignition Device IIDWiring Diagram Single Zone Taco Valve Wiring Diagram System with 3 Zone Pumps Fig. #2223.2e Wiring Diagram Standing Pilot With Low Water Cut Off Device Sequence of Operation Intermittent Ignition Device IID Servicing ProceduresGeneral Location of Controls Control BOX Component Locations Models 135Filling the System START-UP ProceduresWhat to do if YOU Smell GAS Lighting the BoilerFor Automatic Ignition Models Honeywell Pilot Robertshaw PilotTo Turn OFF GAS to Boiler System Shut Down ProcedureFor Automatic Ignition Systems Main Burner Flame Inspection Procedures BurnersSafe Shutdown Tests Limit Action Flame FailureRepair Section Raypak Tube Cleaning KITBurner Drawer Removal Main Burner and Orifice RemovalCombustion Chamber Removal Heat Exchanger RE-ASSEMBLYImportant Notice Trouble Shooting GuidePiping ADJUSTMENTS/REPLACEMENTS of Components RAYPAK, INC Replacement Parts ListBypass valve supplied on sizes H-0135 and H-0180 only Page Venting