Contents
31. RECEIVING EQUIPMENT
32. GENERAL SPECIFICATIONS AND DIMENSIONS
43. INSTALLATION PROCEDURES
4- Code Requirements
4- Mounting Base
4- Clearance Requirements
4- Combustion/Ventilation Air
5- Venting Connections
7- Vent Damper Installation
10 | - Gas Supply Connections |
10 | - Water Connections & System Piping |
14 | - Electrical Wiring |
22 | 4. SERVICING PROCECURES |
22 | - General Locations of Controls |
22- Sequence of Operation
23- Start Up Procedures
28 | - Safe Shutdown Test |
28- Normal Inspection Procedures
29- Repair Section
31 5. TROUBLE SHOOTING GUIDE
33- Adjustments/Replacements of Components
346. REPLACEMENT PARTS LIST
These instructions are provided to assure the proper installation and operation of Raypak boilers. Should questions arise regarding the specifications, installa- tion, operation or servicing of these boilers, we suggest that the local Sales representative or the factory be consulted.
2