GE AEQ25, AEM25 operating instructions Prepare the AiR CONDiTiONER continues, Prepare the Case

Page 10

installation instructions

PREPARE THE AiR CONDiTiONER (continues)

ERemove the shipping screws located on the top of the case.

FRemove the ground screws from each side of the case. Keep it in a safe location.

NOTE: Be sure to save this screw. You will need them later in the installation.

FRONT

GSlide the air conditioner from the case by gripping the base pan handle and pulling forward while bracing the case. Do not pull or lift on the styrofoam discharge area.

Do not pull or lift in this area—

damage to the unit may result

FRONT

HYour unit may come with internal packaging. This packaging must be removed prior to installing the air conditioner back into the cabinet.

PREPARE THE CASE

AAttach the top rail gasket to the bottom of the top rail.

BInstall the top mounting rail with 4 type A screws from the inside of the case. Press firmly to drive the screws into the gasket and through the top mounting rail.

Top mounting rail

CSlide each side retainer onto the edge of each according panel. The figure shows the orientation of each accordion panel and side retainer assembly relative to the case from a top view of the unit.

SIDE RETAINER

WINDOW FILLER PANEL

SIDE RETAINER

WINDOW FILLER PANEL

DSlide the left and right accordion panels into the top and bottom mounting rails.

Top left

Top right

Bottom mounting rail

10

Image 10
Contents 49-7662 12-10 GE Safety Precautions Do not use an adapter plug with this applianceRisk of FIRE. Could cause serious injury or death GEAppliances.comAbout the controls on the air conditioner Energy Saver Mode Remote ControlCool Mode Fan Only ModeCare and cleaning of the air conditioner ELECTRiCAL REQuiREMENTS BEfORE YOu BEgiNTools YOu WiLL Need Window Sash seal Right Accordion Panel Parts IncludedWindow Type E boltPrepare the AiR CONDiTiONER WiNDOW REQuiREMENTSStorm WiNDOW REQuiREMENTS Prepare the AiR CONDiTiONER continues Prepare the CasePrepare the Case continues CaseInstall the AIR Conditioner Install the AIR Conditioner CaseCase continues Through-the-Wall Installation Instructions-Optional Finish the Wall OpeningTroubleshooting Tips Problem Possible Causes What To DoPage Page GE Will Replace What Is Not CoveredOriginal purchase Service to replace the defective part Warrantor General Electric Company. Louisville, KYWarrantor Mabe Canada Inc Burlington, Ontario Mabe Will ReplaceOne Year Assistance à la clientèle 22-24Avertissement Conservez CES Instructions Propos des commandes du climatiseur Commandes du Climatiseur TélécommandeMode Fan Only ventilateur uniquement TélécommandeMode Cool refroidissement Auto Fan Speed vitesse du ventilateur autoEntretien et nettoyage du climatiseur Mise EN Garde NE faites PASExigences Électriques Avant DE CommencerOutillage Nécessaires Type a vis Type C vis Pièces IncluesFerrure de rebord Support en V Verrouillage de Boulon de type EInstructions Relative À LA CONTRE- Fenêtre Préparation DU ClimatiseurAppuyant sur les côtés du logement avec le bout Préparation DU Logement Préparation DU Climatiseur suitePréparer LA Fenêtre ET Poser LE Capot Suite Préparation DU Logement suitePréparer LA Fenêtre ET Poser LE Capot Réglez les ferrures de rebord de fenêtrePour preventez la verre brisez dans les fenêtres Empêcher l’air et les insectes de pénétrer dansImportant suite Finition DE L’OUVERTURE Dans LE MURProblème Bruits normaux de fonctionnementCauses possibles Que fairePage Page Ce qui n’est pas couvert Climatiseur GE-Garantie Limitée D’un AnPour la période d’ Nous remplacerons Garant Mabe Canada Inc Burlington, OntarioAssistance à la clientèle Site Internet GE Instrucciones de instalación Producto etiquetado *EnErgy Star¡ADVERTENCIA No use un enchufe adaptador con este electrodomésticoUSO DE Prolongadores GEAppliances.comAcerca de los controles en el acondicionador de aire Control remotoModo de Fan Only Solo ventilador Energy Saver Mode Modo de ahorro de energíaModo Cool Frío Velocidad de ventilador automáticaCuidado y limpieza del acondicionador de aire Precaución no Opere elANtES DE Iniciar REquISItoS ELéCtRICoSJunta del riel superior HERRAMIENtAS quE NECESItARáPARtES INCLuIDAS Soportes en V Soporte angular Trabas paraREquISItoS DE uNA VENtANA DE toRMENtAS REquISItoS Para LA VENtANACuando se retire la parrilla del frente, el panel de Prepare LA Carcasa Prepare EL ACoNDICIoNADoR DE AirePrepare LA VENtANA E INStALE LA Caja Prepare tHE WINDoW and INStALL tHE CasePrepare LA Carcasa suite De la carcasa con pernos tipoConecte el soporte de cierre INStALE EL ACoNDICIoNADoR EN LA CarcasaVentana para prevenir daño a De la ventana con uno tornilloDE LA Pared IMPoRtANtETERMINE LA ABERtuRA Lea por completo y luego siga todos los pasosProblema Causas posibles Qué hacer Solucionar problemasSonidos de operación normales Notas Notas Notas Garante General Electric Company. Louisville, KY Por el período de GE reemplazaráLo que no está cubierto Un añoApoyo al consumidor Página Web de GE AppliancesConsumer Support Real Life Design Studio

AEM25, AEQ25 specifications

The GE AEQ25 and AEM25 are advanced aircraft engines that exemplify General Electric's commitment to innovation and efficiency in aviation technology. These engines are designed to power a range of medium-range aircraft, with a focus on providing superior performance, reliability, and sustainability.

One of the standout features of the AEQ25 and AEM25 engines is their state-of-the-art turbofan design. The engines incorporate advanced aerodynamics that enhance fuel efficiency while delivering powerful thrust. This turbofan architecture allows for a significant reduction in fuel consumption compared to older engine models, aligning with global efforts to lower carbon emissions in the aviation industry.

The AEQ25 and AEM25 engines utilize cutting-edge materials and manufacturing techniques. Timeless superalloys and composite materials are strategically employed to endure high temperatures and reduce weight. This combination not only enhances performance but also contributes to overall maintenance efficiency. The engines' design includes modular components, allowing for easy inspection and repairs, which minimizes downtime for aircraft operators and enhances the operational readiness of fleets.

A noteworthy technological advancement in these engine models is the introduction of digital monitoring and analytics capabilities. With integrated sensors, the AEQ25 and AEM25 engines provide real-time data on performance metrics, allowing for predictive maintenance. This technology helps operators anticipate potential issues before they become significant problems, ensuring that aircraft remain in optimal operating condition.

In terms of noise reduction, the AEQ25 and AEM25 engines are engineered to comply with stringent regulatory standards. Acoustic liners and optimized fan designs contribute to significantly lower noise levels during takeoff and landing, minimizing the impact on surrounding communities. This focus on noise abatement is increasingly essential as airports strive to balance growth with community concerns.

The AEQ25 and AEM25 engines are also designed with future sustainability in mind. They are compatible with sustainable aviation fuels (SAFs), further enhancing their environmental credentials. These bio-derived fuels can significantly reduce lifecycle greenhouse gas emissions, making these engines a preferred choice for environmentally conscious airlines.

Overall, the GE AEQ25 and AEM25 engines represent a blend of innovative technology, efficiency, and sustainability, poised to meet the demands of modern air travel while paving the way for a greener future in aviation. With their reliable performance, reduced operational costs, and commitment to environmental stewardship, these engines are set to play a crucial role in the evolving landscape of the aerospace industry.