Stovax PR0919 manual Method 1 Frame only

Page 18

INSTALLATION INSTRUCTIONS

INSTALLATION

17Studio 1 BF

Studio 2 BF

Studio 1 & 2 BF

AR1671, AR1971, AR1673

TAKE CARE WHEN MARKING OUT FOR THE FLUE AS IT IS DIFFICULT TO MOVE AFTER INSTALLATION. IF A RESTRICTOR IS REQUIRED FIT THIS BETWEEN THE SMALL OUTLET SPIGOT AND THE AIR DUCT SEE DIAGRAM 18. REFER TO TECHNICAL SPECIFICATIONS FOR RESTRICTOR SIZE.

18

AR0627

4.2A 152mm (6") diameter hole in the wall is required to install the flue. This can be achieved by either:

a)Core drill

b)Hammer and chisel

Drill small holes around the circumference when using method b. Make good both ends of the hole.

4.3• Remove the backing paper from the silicone foam strip supplied in the fixing kit

Fix to the back of the outer flanges of the appliance

Ensure it is located below the frame location lugs on the top flange. Foam strip may need cutting to length.

4.4When installing the appliance into a combustible enclosure, ensure all the clearances are observed.

METHOD 1 (FRAME) ONLY

Secure the appliance through the four fixing holes using the screws provided. See Diagram 19.

19

AR1914

4.5• Allow enough room either above or to the side of the appliance to assemble the flue on top

Assemble a horizontal flue in the following order:

-Vertical section

-90° elbow

-Horizontal plus terminal

Support the opening of a masonry installation with a lintel

18

Image 18
Contents Studio 8701BFCHEC Covering the Following ModelStudio 1 Balanced flue Studio 2 Balanced flue P8701BFCHECFail APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK GAS CHECKGeneral MAN ModeUser Instructions Lighting the StudioTouch PAD Control Emergency Shut OFF Cleaning the StudioChanging the Studio Batteries All modelsArrangement of Fuel BED HOT SURFACESFire will not Light Covering the Following Models Installation InstructionsTechnical Specification Studio 1 BF Studio 2 BFPacking Checklist Qty Description Fixing Kit containingStudio 1BF Studio 2BF Steel Frame Dimensions Studio 836 1036 510 740 940 414 12.5850 1050 524 740 940 414 SITE REQUIREMENTS Flue and Chimney RequirementsTOP Flue UP & OUT KIT Flue Options Studio 1 BFStudio 2 BF TOP Flue UP & OUT with Additional BendExtra Flue Lengths TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN GAS SupplyInstallation of the appliance SITE REQUIREMENTS/INSTALLATIONSafety Precautions Appliance LocationInstallation Stud Work InstallationStud Work Installation Method 1 Frame Wall plate Flue Assembly Stud Work Installation Method 2 EdgeMethod 1 Frame only Assembling the Appliance Add 10 mm to the outlet endThermostatic Remote Control Lighting the StudioInstallation Instructions Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing RequirementsIgnition Functional Check Flame Failure Functional CheckGeneral Replacing PartsWindow Frame Assembly Decorative FrameGlass Window Black Enamelled PanelsMaIN Burner MaIN Control Assembly Ensure no stone pebbles fall into the pilot areaPilot Unit Assembly Ignition LeadMagnetic safety valve GAS ValveControl BOX Primary Aeration Plate Pressure and Leak Testing the ApplianceMain injector Changing between Gas TypesShoRt Spares List Studio 1 BF Studio 2 BFComponent Service Records Member of the Stovax Group