Stovax PR0919 manual Studio

Page 1

STUDIO

Balanced Flue

Instructions for Use,

Installation and Servicing

For use in GB, IE (Great Britain and Eire)

This appliance has been certified for use in countries other than those stated. To install this appliance in these countries, it is essential to obtain the

translated instructions and in some cases the appliance will require modification. Contact Gazco for further information.

IMPORTANT

Do not attempt to burn rubbish in this appliance. This appliance must only be operated with the glass door secured firmly in position. The front casing of this appliance will become hot whilst in operation, it is therefore recommended that a suitable guard should be used for the protection of young children, the elderly or infirm.

These instructions must be left at the property for future reference and when servicing the fire.

The Commissioning Sheet found on page 3 must be completed by the Corgi Installer.

PR0919 Issue 5 (January 2008)

Image 1
Contents Studio Studio 1 Balanced flue Studio 2 Balanced flue Covering the Following Model8701BFCHEC P8701BFCHECFLUE CHECK APPLIANCE COMMISSIONING CHECKLISTFail GAS CHECKUser Instructions MAN ModeGeneral Lighting the StudioTouch PAD Control Changing the Studio Batteries Cleaning the StudioEmergency Shut OFF All modelsHOT SURFACES Arrangement of Fuel BEDFire will not Light Technical Specification Installation InstructionsCovering the Following Models Studio 1 BF Studio 2 BFQty Description Fixing Kit containing Packing ChecklistStudio 1BF Studio 2BF 836 1036 510 740 940 414 12.5 Steel Frame Dimensions Studio850 1050 524 740 940 414 Flue and Chimney Requirements SITE REQUIREMENTSStudio 2 BF Flue Options Studio 1 BFTOP Flue UP & OUT KIT TOP Flue UP & OUT with Additional BendTOP Flue Vertical Offset KIT 8530/8530AN TOP Flue Vertical KIT 8524/8524ANExtra Flue Lengths GAS SupplySafety Precautions SITE REQUIREMENTS/INSTALLATIONInstallation of the appliance Appliance LocationStud Work Installation InstallationStud Work Installation Method 1 Frame Wall plate Stud Work Installation Method 2 Edge Flue AssemblyMethod 1 Frame only Add 10 mm to the outlet end Assembling the ApplianceLighting the Studio Thermostatic Remote ControlInstallation Instructions Commissioning CommissioningSymptom Cause Remedy Servicing / Fault Finding ChartsServicing Instructions Servicing RequirementsFlame Failure Functional Check Ignition Functional CheckWindow Frame Assembly Replacing PartsGeneral Decorative FrameBlack Enamelled Panels Glass WindowMaIN Burner Ensure no stone pebbles fall into the pilot area MaIN Control AssemblyIgnition Lead Pilot Unit AssemblyGAS Valve Magnetic safety valveControl BOX Main injector Pressure and Leak Testing the AppliancePrimary Aeration Plate Changing between Gas TypesStudio 1 BF Studio 2 BF ShoRt Spares ListComponent Service Records Member of the Stovax Group