INSTALLATION INSTRUCTIONS

INSTALLATION

Fit the supplied top support bar into the stud work at the correct height, Diagram 7, because no combustible material can be used above the fire

7

AR1904

Attach the 4 frame fixing brackets to the fire, Diagram 8

Fix foam seal to the outer flange of the fire

8

AR1913

Position the fire

Fit non-combustible board to the stud work around the fire. This should extend a minimum of 400mm above the appliance and at least 50mm to the sides of the appliance (from the outer box, not the flanges).

Apply plasterboard to the remainder of the stud work

Secure the fire back to the stud work using four screws through flange, bracket, support bar

Apply a plaster finish to the front of the chimney breast

Decide on the position for the wall box containing the batteries and wall switch

Connect the wire from the fire to the battery pack,

Diagram 9

9

AR1920

Connect the wire from the fire to the touch pad/ connector, Diagram 10

10

AR1919

Correctly position the four new AA size batteries

Re-assemble the battery holder as shown in Diagram 11

Ensure the touch pad cable is tucked to the left on fitting the wall plate back onto the wall

11

AR1932

•Secure the wall plate with the touch pad attached to the wall box, Diagram 12

12

wall plate

AR1887

 

Because of the high temperatures this fire achieves, it is advisable to use marble slips or similar material between the appliance and the plasterboard

Never use a one-piece slip as expansion (even cracking) can occur. If a slip is used, longer screws are needed to secure the appliance.

Connect the flue system and gas services using the opening in the side of the chimney breast for access. After commissioning, finish the sides of the chimney breast, Diagram 13

16

Image 16
Contents Studio Covering the Following Model Studio 1 Balanced flue Studio 2 Balanced flue8701BFCHEC P8701BFCHECAPPLIANCE COMMISSIONING CHECKLIST FLUE CHECKFail GAS CHECKMAN Mode User InstructionsGeneral Lighting the StudioTouch PAD Control Cleaning the Studio Changing the Studio BatteriesEmergency Shut OFF All modelsHOT SURFACES Arrangement of Fuel BEDFire will not Light Installation Instructions Technical SpecificationCovering the Following Models Studio 1 BF Studio 2 BFQty Description Fixing Kit containing Packing ChecklistStudio 1BF Studio 2BF 836 1036 510 740 940 414 12.5 Steel Frame Dimensions Studio850 1050 524 740 940 414 SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Studio 1 BF Studio 2 BFTOP Flue UP & OUT KIT TOP Flue UP & OUT with Additional BendTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplySITE REQUIREMENTS/INSTALLATION Safety PrecautionsInstallation of the appliance Appliance LocationStud Work Installation InstallationStud Work Installation Method 1 Frame Wall plate Flue Assembly Stud Work Installation Method 2 EdgeMethod 1 Frame only Assembling the Appliance Add 10 mm to the outlet endThermostatic Remote Control Lighting the StudioInstallation Instructions Commissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Instructions Servicing RequirementsIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameBlack Enamelled Panels Glass WindowMaIN Burner MaIN Control Assembly Ensure no stone pebbles fall into the pilot areaPilot Unit Assembly Ignition LeadGAS Valve Magnetic safety valveControl BOX Pressure and Leak Testing the Appliance Main injectorPrimary Aeration Plate Changing between Gas TypesStudio 1 BF Studio 2 BF ShoRt Spares ListComponent Service Records Member of the Stovax Group