INSTALLATION INSTRUCTIONS

COMMISSIONING

7.COMMISSIONING

7.1Complete the Commissioning Checklist at the front of this manual covering:

Flue checks

Gas checks

Pebble layout - flame picture

For working pressure test, use the access panel at the gas connection ensuring the burner is in position.

7.2In the unlikely event that the appliance is receiving interference from other electronic devices, re-programme the handset/Control box

Reprogramming handset/Control box

Remove the battery cover from the handset to see the four DIP switches. See diagram29

29

AR1935

Each of the four switches can be set to either one of two positions, in any combination.

To re-code the handset

Change the combination of how the DIP switches are set.

For example see diagram20

30

AR1936

Once the handset has a new code the control box needs to be reprogrammed:

To access the control box see Servicing Instructions, Section

7- Main Control Assembly.

Press and hold the reset button on the control box until you hear two signals. After the second longer signal:

Release the reset button and within 20 seconds

Press the DOWN button on the handset until you hear an additional long signal confirming the new code

22

Image 22
Contents Studio 8701BFCHEC Covering the Following ModelStudio 1 Balanced flue Studio 2 Balanced flue P8701BFCHECFail APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK GAS CHECKGeneral MAN ModeUser Instructions Lighting the StudioTouch PAD Control Emergency Shut OFF Cleaning the StudioChanging the Studio Batteries All modelsHOT SURFACES Arrangement of Fuel BEDFire will not Light Covering the Following Models Installation InstructionsTechnical Specification Studio 1 BF Studio 2 BFQty Description Fixing Kit containing Packing ChecklistStudio 1BF Studio 2BF 836 1036 510 740 940 414 12.5 Steel Frame Dimensions Studio850 1050 524 740 940 414 SITE REQUIREMENTS Flue and Chimney RequirementsTOP Flue UP & OUT KIT Flue Options Studio 1 BFStudio 2 BF TOP Flue UP & OUT with Additional BendExtra Flue Lengths TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN GAS SupplyInstallation of the appliance SITE REQUIREMENTS/INSTALLATIONSafety Precautions Appliance LocationStud Work Installation InstallationStud Work Installation Method 1 Frame Wall plate Flue Assembly Stud Work Installation Method 2 EdgeMethod 1 Frame only Assembling the Appliance Add 10 mm to the outlet endThermostatic Remote Control Lighting the StudioInstallation Instructions Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing RequirementsIgnition Functional Check Flame Failure Functional CheckGeneral Replacing PartsWindow Frame Assembly Decorative FrameBlack Enamelled Panels Glass WindowMaIN Burner MaIN Control Assembly Ensure no stone pebbles fall into the pilot areaPilot Unit Assembly Ignition LeadGAS Valve Magnetic safety valveControl BOX Primary Aeration Plate Pressure and Leak Testing the ApplianceMain injector Changing between Gas TypesStudio 1 BF Studio 2 BF ShoRt Spares ListComponent Service Records Member of the Stovax Group