Stovax PR0919 manual Appliance Commissioning Checklist, Flue Check, Fail, Gas Check

Page 3

APPLIANCE COMMISSIONING CHECKLIST

IMPORTaNT NOTICE

Explain the operation of the appliance to the end user, hand the completed instructions to them for safe keeping,

as the information will be required when making any guaranteed claims.

 

FLUE CHECK

 

Pass

 

Fail

 

 

 

 

 

 

 

 

 

 

 

1.

Flue is correct for appliance

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Flue flow test N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Spillage test N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS CHECK

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Gas soundness & let by test

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Standing pressure test

 

mb

 

 

 

 

 

 

 

 

 

 

 

3.

Appliance working pressure (on High Setting)

 

mb

 

 

 

 

 

NB All other gas appliances must be operating on full

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.

Gas rate

 

m3/h

 

 

 

5.

Does ventilation meet appliance requirements N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DEALER AND INSTALLER INFORMATION

Dealer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contact No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date of Purchase. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Model No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Serial No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Gas Type. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Installation Company . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Engineer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contact No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Corgi Reg No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date of Installation . . . . . . . . . . . . . . . . . . . . . . . . . . .

This product is guaranteed for 2 years from the date of installation, as set out in the terms and conditions of sale between Gazco and your local Gazco dealer. This guarantee will be invalid, to the extent permitted by law, if the above Appliance Commissioning Checklist is not fully completed by the installer and available for inspection by a Gazco engineer. The guarantee will only be valid during the second year, to the extent permitted by law, if the annual service recommended in the Instructions for Use has been completed by a Corgi registered engineer, and a copy of the service visit report is available for inspection by a Gazco engineer.

3

Image 3
Contents Studio P8701BFCHEC Covering the Following ModelStudio 1 Balanced flue Studio 2 Balanced flue 8701BFCHECGAS CHECK APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK FailLighting the Studio MAN ModeUser Instructions GeneralTouch PAD Control All models Cleaning the StudioChanging the Studio Batteries Emergency Shut OFFArrangement of Fuel BED HOT SURFACESFire will not Light Studio 1 BF Studio 2 BF Installation InstructionsTechnical Specification Covering the Following ModelsPacking Checklist Qty Description Fixing Kit containingStudio 1BF Studio 2BF Steel Frame Dimensions Studio 836 1036 510 740 940 414 12.5850 1050 524 740 940 414 Flue and Chimney Requirements SITE REQUIREMENTSTOP Flue UP & OUT with Additional Bend Flue Options Studio 1 BFStudio 2 BF TOP Flue UP & OUT KITGAS Supply TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN Extra Flue LengthsAppliance Location SITE REQUIREMENTS/INSTALLATIONSafety Precautions Installation of the applianceInstallation Stud Work InstallationStud Work Installation Method 1 Frame Wall plate Stud Work Installation Method 2 Edge Flue AssemblyMethod 1 Frame only Add 10 mm to the outlet end Assembling the ApplianceLighting the Studio Thermostatic Remote ControlInstallation Instructions Commissioning CommissioningServicing Requirements Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing InstructionsFlame Failure Functional Check Ignition Functional CheckDecorative Frame Replacing PartsWindow Frame Assembly GeneralGlass Window Black Enamelled PanelsMaIN Burner Ensure no stone pebbles fall into the pilot area MaIN Control AssemblyIgnition Lead Pilot Unit AssemblyMagnetic safety valve GAS ValveControl BOX Changing between Gas Types Pressure and Leak Testing the ApplianceMain injector Primary Aeration PlateShoRt Spares List Studio 1 BF Studio 2 BFComponent Service Records Member of the Stovax Group