Stovax PR0919 manual Glass Window, Black Enamelled Panels, MaIN Burner

Page 26

SERVICING INSTRUCTIONS

REPLACING PARTS

4.GLASS WINDOW

4.1Remove the two clips and brackets from either side of the frame, Diagram 5

5

AR1864

Lift the glass clear from the lock bracket at the top of the frame and slide out

5.BLACK ENAMELLED PANELS

5.1Slide the side panels forward until clear of the appliance, Diagram 6

6

AR1865

Lift the bottom panel out of the appliance

5.2When you remove the back panel you need to first remove the main burner, see Section 6 below.

Remove the main burner

Slide the lower edge of the back panel forward

7

AR1866

Lift the panel from the appliance, Diagram 7

5.3To reassemble the panels in reverse order:

At an angle, slide the top of the back panel into place before the lower edge is pushed back

Replace the main burner

Replace the bottom panel

Replace the side panels

6.maIN BURNER

6.1To replace the main burner:

Remove the stone pebbles from the burner (optional)

Remove the burner securing screw from the left side of the burner, Diagram 8

8

AR1867

Slide the burner fully to the left

Lift the right side clear of the pilot, Diagram 9

26

Image 26
Contents Studio 8701BFCHEC Covering the Following ModelStudio 1 Balanced flue Studio 2 Balanced flue P8701BFCHECFail APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK GAS CHECKGeneral MAN ModeUser Instructions Lighting the StudioTouch PAD Control Emergency Shut OFF Cleaning the StudioChanging the Studio Batteries All modelsFire will not Light Arrangement of Fuel BEDHOT SURFACES Covering the Following Models Installation InstructionsTechnical Specification Studio 1 BF Studio 2 BFStudio 1BF Studio 2BF Packing ChecklistQty Description Fixing Kit containing 850 1050 524 740 940 414 Steel Frame Dimensions Studio836 1036 510 740 940 414 12.5 SITE REQUIREMENTS Flue and Chimney RequirementsTOP Flue UP & OUT KIT Flue Options Studio 1 BFStudio 2 BF TOP Flue UP & OUT with Additional BendExtra Flue Lengths TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN GAS SupplyInstallation of the appliance SITE REQUIREMENTS/INSTALLATIONSafety Precautions Appliance LocationStud Work Installation Method 1 Frame InstallationStud Work Installation Wall plate Flue Assembly Stud Work Installation Method 2 EdgeMethod 1 Frame only Assembling the Appliance Add 10 mm to the outlet endThermostatic Remote Control Lighting the StudioInstallation Instructions Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing RequirementsIgnition Functional Check Flame Failure Functional CheckGeneral Replacing PartsWindow Frame Assembly Decorative FrameMaIN Burner Glass WindowBlack Enamelled Panels MaIN Control Assembly Ensure no stone pebbles fall into the pilot areaPilot Unit Assembly Ignition LeadControl BOX Magnetic safety valveGAS Valve Primary Aeration Plate Pressure and Leak Testing the ApplianceMain injector Changing between Gas TypesComponent ShoRt Spares ListStudio 1 BF Studio 2 BF Service Records Member of the Stovax Group