Stovax PR0919 Packing Checklist, Qty Description Fixing Kit containing, Studio 1BF Studio 2BF

Page 9

INSTALLATION INSTRUCTIONS

TECHNICAL SPECIFICATION

This appliance has been certified for use in countries other than those stated. To install this appliance in these countries, it is essential to obtain the translated instructions and in some cases the appliance will require modification. Contact Gazco for further information.

PACKING CHECKLIST

Qty Description

Fixing Kit containing:-

 

 

1 White Stone Chippings

1 x Instruction Manual

 

4 x Wood Screws

 

4 x Rawl Plugs

 

1 x Handset

 

4 x AA cell batteries

 

1 x 9V cell batteries

 

1 x wall box

 

1 x touch pad/wall plate

 

1 x battery holder

 

 

745 - Studio 1BF

945 - Studio 2BF

820 - Studio 1BF

1020 - Studio 2BF

9

Image 9
Contents Studio Studio 1 Balanced flue Studio 2 Balanced flue Covering the Following Model8701BFCHEC P8701BFCHECFLUE CHECK APPLIANCE COMMISSIONING CHECKLISTFail GAS CHECKUser Instructions MAN ModeGeneral Lighting the StudioTouch PAD Control Changing the Studio Batteries Cleaning the StudioEmergency Shut OFF All modelsArrangement of Fuel BED HOT SURFACESFire will not Light Technical Specification Installation InstructionsCovering the Following Models Studio 1 BF Studio 2 BFPacking Checklist Qty Description Fixing Kit containingStudio 1BF Studio 2BF Steel Frame Dimensions Studio 836 1036 510 740 940 414 12.5850 1050 524 740 940 414 Flue and Chimney Requirements SITE REQUIREMENTSStudio 2 BF Flue Options Studio 1 BFTOP Flue UP & OUT KIT TOP Flue UP & OUT with Additional BendTOP Flue Vertical Offset KIT 8530/8530AN TOP Flue Vertical KIT 8524/8524ANExtra Flue Lengths GAS SupplySafety Precautions SITE REQUIREMENTS/INSTALLATIONInstallation of the appliance Appliance LocationInstallation Stud Work InstallationStud Work Installation Method 1 Frame Wall plate Stud Work Installation Method 2 Edge Flue AssemblyMethod 1 Frame only Add 10 mm to the outlet end Assembling the ApplianceLighting the Studio Thermostatic Remote ControlInstallation Instructions Commissioning CommissioningSymptom Cause Remedy Servicing / Fault Finding ChartsServicing Instructions Servicing RequirementsFlame Failure Functional Check Ignition Functional CheckWindow Frame Assembly Replacing PartsGeneral Decorative FrameGlass Window Black Enamelled PanelsMaIN Burner Ensure no stone pebbles fall into the pilot area MaIN Control AssemblyIgnition Lead Pilot Unit AssemblyMagnetic safety valve GAS ValveControl BOX Main injector Pressure and Leak Testing the AppliancePrimary Aeration Plate Changing between Gas TypesShoRt Spares List Studio 1 BF Studio 2 BFComponent Service Records Member of the Stovax Group