Stovax PR0919 manual MaIN Control Assembly, Ensure no stone pebbles fall into the pilot area

Page 27

SERVICING INSTRUCTIONS

REPLACING PARTS

9

AR1868

Slide the burner to the right and out of its location

Refit in reverse order

When refilling the stone pebbles, fill to the level of the rim of the burner tray and flatten level.

Ensure no stone pebbles fall into the pilot area.

7.maIN CONTROL ASSEMBLY

7.1To access the main control assembly, first remove:

the decorative frame

window frame

enamelled panels

main burner

7.2To remove the access panel:

Undo the two screws, Diagram 10

Note the orientation of the access panel with the return edges facing forward

10

AR1869

7.3Isolate the gas supply at the isolation device and disconnect the gas inlet, Diagram 11.

11

7.4Remove the six screws securing the control assembly, Diagram 12.

12

AR1869

7.5The control panel can now be tilted back to reveal the controls, Diagram 13

13

AR1871

7.6Disconnect the two cables marked ‘A’ in Diagram 14.

14

A

A

C

AR1873

B

Disconnect the battery extension lead, Diagram 14, B

Disconnect the touch pad extension lead, Diagram 14, C

The control assembly can now be lifted up and removed.

Reassemble in reverse order

AR1888

27

Image 27
Contents Studio P8701BFCHEC Covering the Following ModelStudio 1 Balanced flue Studio 2 Balanced flue 8701BFCHECGAS CHECK APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK FailLighting the Studio MAN ModeUser Instructions GeneralTouch PAD Control All models Cleaning the StudioChanging the Studio Batteries Emergency Shut OFFArrangement of Fuel BED HOT SURFACESFire will not Light Studio 1 BF Studio 2 BF Installation InstructionsTechnical Specification Covering the Following ModelsPacking Checklist Qty Description Fixing Kit containingStudio 1BF Studio 2BF Steel Frame Dimensions Studio 836 1036 510 740 940 414 12.5850 1050 524 740 940 414 Flue and Chimney Requirements SITE REQUIREMENTSTOP Flue UP & OUT with Additional Bend Flue Options Studio 1 BFStudio 2 BF TOP Flue UP & OUT KITGAS Supply TOP Flue Vertical KIT 8524/8524ANTOP Flue Vertical Offset KIT 8530/8530AN Extra Flue LengthsAppliance Location SITE REQUIREMENTS/INSTALLATIONSafety Precautions Installation of the applianceInstallation Stud Work InstallationStud Work Installation Method 1 Frame Wall plate Stud Work Installation Method 2 Edge Flue AssemblyMethod 1 Frame only Add 10 mm to the outlet end Assembling the ApplianceLighting the Studio Thermostatic Remote ControlInstallation Instructions Commissioning CommissioningServicing Requirements Servicing / Fault Finding ChartsSymptom Cause Remedy Servicing InstructionsFlame Failure Functional Check Ignition Functional CheckDecorative Frame Replacing PartsWindow Frame Assembly GeneralGlass Window Black Enamelled PanelsMaIN Burner Ensure no stone pebbles fall into the pilot area MaIN Control AssemblyIgnition Lead Pilot Unit AssemblyMagnetic safety valve GAS ValveControl BOX Changing between Gas Types Pressure and Leak Testing the ApplianceMain injector Primary Aeration PlateShoRt Spares List Studio 1 BF Studio 2 BFComponent Service Records Member of the Stovax Group