Stovax PR0919 manual Lighting the Studio, Thermostatic Remote Control

Page 20

INSTALLATION INSTRUCTIONS

INSTALLATION

Offer the frame to the foot of the opening

Slide the frame to the right to locate the right hinge pin

24

AR1865

5.4• Manoeuvre the frame up towards the left side to locate the left hinge pin

Slide onto the hinge with a right movement

Secure in place with a spring clip at the right hinge pin,

Diagram 25

25

AR1862

Close the window

5.5Using the allen key provided:

Close the window locks by moving from open to shut towards the window centre

26

6. LIGHTING THE STUDIO

Note: The Emergency Shut Off switch must be in the ON

position, refer to Section 2, User Instructions. There are two ways of lighting the Studio:

by thermostatic remote control

using the fire’s touch pad

THERMOSTATIC REMOTE CONTROL

27

AR1883

This remote controls the appliance from pilot ignition through to shut down. In ‘MANUAL MODE’ you can:

light the pilot

turn on the main burner

regulate the flame from low to high and back

turn off the burner leaving just the pilot burning In ‘TEMP MODE’ you can:

set the room temperature so the stove automatically maintains that temperature

In ‘TIMER MODE’ the stove:

turns on and off according to the set time periods

automatically regulates the room temperature during the set periods

TOUCH PAD CONTROL

28

AR1860

AR1885

20

Image 20
Contents Studio Covering the Following Model Studio 1 Balanced flue Studio 2 Balanced flue8701BFCHEC P8701BFCHECAPPLIANCE COMMISSIONING CHECKLIST FLUE CHECKFail GAS CHECKMAN Mode User InstructionsGeneral Lighting the StudioTouch PAD Control Cleaning the Studio Changing the Studio BatteriesEmergency Shut OFF All modelsFire will not Light Arrangement of Fuel BEDHOT SURFACES Installation Instructions Technical SpecificationCovering the Following Models Studio 1 BF Studio 2 BFStudio 1BF Studio 2BF Packing ChecklistQty Description Fixing Kit containing 850 1050 524 740 940 414 Steel Frame Dimensions Studio836 1036 510 740 940 414 12.5 SITE REQUIREMENTS Flue and Chimney RequirementsFlue Options Studio 1 BF Studio 2 BFTOP Flue UP & OUT KIT TOP Flue UP & OUT with Additional BendTOP Flue Vertical KIT 8524/8524AN TOP Flue Vertical Offset KIT 8530/8530ANExtra Flue Lengths GAS SupplySITE REQUIREMENTS/INSTALLATION Safety PrecautionsInstallation of the appliance Appliance LocationStud Work Installation Method 1 Frame InstallationStud Work Installation Wall plate Flue Assembly Stud Work Installation Method 2 EdgeMethod 1 Frame only Assembling the Appliance Add 10 mm to the outlet endThermostatic Remote Control Lighting the StudioInstallation Instructions Commissioning CommissioningServicing / Fault Finding Charts Symptom Cause RemedyServicing Instructions Servicing RequirementsIgnition Functional Check Flame Failure Functional CheckReplacing Parts Window Frame AssemblyGeneral Decorative FrameMaIN Burner Glass WindowBlack Enamelled Panels MaIN Control Assembly Ensure no stone pebbles fall into the pilot areaPilot Unit Assembly Ignition LeadControl BOX Magnetic safety valveGAS Valve Pressure and Leak Testing the Appliance Main injectorPrimary Aeration Plate Changing between Gas TypesComponent ShoRt Spares ListStudio 1 BF Studio 2 BF Service Records Member of the Stovax Group