Ultimate Products UP-206 manual Completed Operator set up view

Page 12

10

Rod with turnbuckle (Part No. CL100 and CL101) will rise when opening the door Thus after opening door to desired height, the rod closest to the wall will be extended out of the cylinder

Now we will attach Part No. ‘CL102’ to the rod that is not extended out of the cylinder

Your open and close door limits are set. You are now ready for control box installation. (See Part 3)

Completed Operator set up view.

Image 12
Contents  Necessary tools Supplies needed but not included with this kitPart 1BELT Installation Installing Tensioner Kit Before installing the air cylinder, Installing Tensioner Kit As shown on From belt before installing belt onto Operator Hanging Operator Page Page Setting Open and Close Door Limits Completed Operator set up view Installation Chain Drive Part 2INSTALLING Chain Drive Step Installing Chain Speed Control Kit Sprocket Assembly Part No. SPK1000 Step Completed Chain Operator set up, see Part Installing Air Lines Part 6a U Series Part 6b S Series Door adjustments and fine tuning Install Signal Senders TroubleshootingFixing Door or Operator Problems Fixing Control Problems Automatic Oiler Adjustment Cable Jumping Cable jumping solutionsDoor cable is jumping Putting the cable back on the drum2624 Model DC Model DC Model DC Home of the Best Buy Guarantee Photo Amplifier Wiring Directions Limit Switch Wiring and Mounting Suggested Installation of Magnetic Loop Wiring Diagram Finder Timer to Control Box Operator with Belt Operator with Chain Ring AP1004 Check ball Power Supply DimensionsControl Box ModelOperators Superior or Economy Air-Powered Operators Ultimate Air-Powered OperatorOperators with chains Operators with beltsCylinder Oiling Operators with Automatic OilersOperators without Oiler Items included in the kit Tools and materials neededCup Seals Piston Rod Seals Breather Vents and Check BallNeedle Valve Page Technical assistance and salespeople are available Monday