14
Step 4
Before hanging air-powered operator, install speed control kit (Part No. TC2002). Locate kit with speed control valves, elbows, and two remaining elbows of sprocket kit. Remove red plugs from air powered operator insert brass elbows See Figure F. Tighten slightly with 9/16 open-end wrench. Attach speed control valve at top of operator bracket with (2) two each 10x24x3/8 machine screws (provided) as shown in Figure G. After installing valves stretch air lines to bottom elbows, cutting air lines ¾” longer than top of elbow. Attach air lines as shown in Figure H.
Speed Control Kit