1
Note: Inspect door for smooth rolling and proper balancing before installing Air Powered Operator.
Part 1:BELT INSTALLATION
Step 1
Determine which side of door to install the air powered operator. 6” of shaft is required beyond track bracket.
Clearance Requirements
8” of side clearance is required to mount operator.