Remington QFP40 manual Logset Install, Logset and Nugget Installation, LOG Identification

Page 50

LOGSET INSTALL

REMINGTON QFP40 Direct Vent FIREPLACE

LOGSET AND NUGGET INSTALLATION

NOTE: If you plan to install the optional brick set, do so prior to installing the logset, nuggets and lava rock. Continue at this point AFTER installing the optional brick set.

LOG IDENTIFICATION

Rear Log

Right Twig

Left Twig

Rear Log

Lower Front

Lower Center

Lower Right

Left Twig

Front Twig

Front Twig

1.Install complete bag of lavarock in indicated gray area ONLY shown in Figs. 1 & 2.

2.Install nuggets. Avoid covering burner secondary air channels, nuggets should be distrib- uted evenly; one layer on front and back shelves. CAUTION! Avoid nugget buildup at pilot transfer channel. See Fig.

 

FIG. 1 FIREBOX FLOOR

LAVA

SECONDARY

ROCK

AIR GAPS

 

NUGGETS

PILOT CHANNEL

 

LAVA

 

ROCK

LAVA ROCK

Page 50

250-4721 JUNE 2001

Image 50
Contents For Your Safety What to do if YOU Smell GASWelcome CongratulationsModel Name Serial Number Date Purchased Contents Troubleshooting Parts & Accessories Warranty Completing InstallationMaintenance OperationSafety Label Ratings PlateSTANDARDS/CLEARANCES Label Model Remington QFP40 Vented GAS Fireplace HeaterSafety Notices Safety Notices If YOU Smell GASSpecifications Heating SpecificationsMinimum Cabinet Dimensions Installation Terminology PreparationAN Overview Installation to Operation PreparationLP Conversion LP Conversion InstructionsConversion INSTRUCTIONS, FIG. BInstallation Minimum Framing DimensionsCorner Installations Raised Fireplace Raised Fireplace with Raised Hearth Hearth Requirements Mantel Requirements Combustible MantelsFascia Dimensions Acid Wash AlertInstallation Facing Requirements Rectangular FasciaFacing Over 1 25mm Thick Venting Installation PrecautionsSafety Precautions for the Installer General Venting InstructionsSimpson DURA-VENT Parts List Venting Installation Options & Guidelines Vertical Termination RuleOnly #HHW2Venting INSTALLATION, Installation Into a Class a Metal Chimney USA onlyInstallation Into a Masonry Chimney USA only HOW to USE Vent Graph Horizontal Termination Requirements Horizontal Installation Female Locking Lugs Male Locking LugsWall Siding Beneath Removed Wood ScrewHHW2 Venting Vertical Installation Instructions Using GS Series PipeVenting Minimum Clearance Cathedral Ceiling Installation Installation Into a Class a Metal Chimney USA only Installation Into AN Existing Masonry Chimney USA only Venting Venting GAS Line GAS Line RequirementsElectrical Copper White Wire BlackOptional Thermostat Installation Electrical ConnectionBrick Install Brick InstallationBrick INSTALLATION, LOG Identification Logset InstallLogset and Nugget Installation Logset and Nugget INSTALLATION, Nugget PlacementLeft Twig Glass Installing GlassInstalling Fascia FasciaInitial START-UP Normal Occurrences Leak TEST/START-UPLeak Test Lighting Lighting InstructionsDamper Adjustment AdjustmentsShutter Adjustment Adjusting the Blower SpeedHigh Altitude Operation Control Panel OperationOperation Maintenance MaintenanceYearly Servicing Procedures Glass Replacement Blower Replacement Electrical Schematic Troubleshooting TroublshootingTROUBLESHOOTING, Parts & Accessories PartsWarranty WarrantyDirect Vent Gas Fireplace